User's Manual
Table Of Contents
- BreezeNET B130/B300 GigE Technical User Manual
- Chapter 1 - Getting Started
- Chapter 2 - Hardware Description
- 2.1 Power supply units (IDU)
- 2.2 Outdoor Units (ODU)
- 2.3 Installation Preparations
- 2.3.1 Required Components and Accessories
- 2.3.2 Antenna Placement
- 2.3.3 Antenna Poles Usage
- 2.3.4 Poles with Stretching
- 2.3.5 Wall Mounted Pole
- 2.3.6 Antenna Poles Requirements
- 2.3.7 Grounding when Using IDU-BS-G
- 2.3.8 Antenna Alignment
- 2.3.9 Precaution Measures
- 2.3.10 Service Cable Soldering Procedure
- 2.3.11 Tools Required at the Installation Site
- 2.4 BU/RB-B130D/B300D-5X-GigE
- 2.5 BU/RB-B130/B300-5X-GigE
- 2.6 Mounting Kit (MOUNT-KIT-85)
- 2.7 Specifications
- Chapter 3 - Basic Configuration Instructions
- Chapter 4 - Link Configuration
- Chapter 5 - Configuration Via Web Interface
- Chapter 6 - Supplementary Information
Chapter 2 - Hardware Description Installation Preparations
Alvarion BreezeNET B130/B300 GigE 18 Technical User Manual
Table 2-3: RJ-45 Connector Soldering Procedure
Illustration Description
Step 1. Peel STP service cable and
prepare "RJ-45" connector parts.
Use RJ-45 connector without
grounding here (RJ-45 connector
with grounding is used for
connecting service cable to IDU).
Step 2. Stick rubber filler - 5 on the
Part 4, previously having removed
protective white layer from rubber
filler -5.
Insert Part 2 inside part 4 up to the
stop. Part 2 must be entirely within
Part 4.