User's Manual
Table Of Contents
- 1 Introduction
- 2 The Concept
- 3 BreezeCELL Architecture
- 4 BreezeCELL Network Elements
- 5 Frequency Allocations
- 6 MIMO Support
- 7 Monitoring & Control
- 8 Installation Requirements and Procedures
- 9 Headend Equipment Installation
- 9.1 Connector Information
- 9.2 Rack Installation
- 9.3 Connecting the BreezeCELL Equipment
- 9.4 Connecting the Monitoring System
- 9.5 Connecting External Alarms
- 9.6 Connecting the Base Stations
- 9.7 UDC Configuration
- 9.8 Pilot Master/Slave Configuration
- 9.9 Measurements
- 9.10 Connecting to the Coax TV Networks
- 9.11 Measurements
- 9.12 Localized Testing Port
- 9.13 Determining BTS Output Power VS. Remote Unit Output Power
- 10 Coax Network Amplifier Installation (if applicable)
- 11 Remote Unit Installation
- 12 Preparing for Remote Unit Installation
- 13 Normal Operations
- 14 Acceptance Testing
In-building Cellular Solution for Commercial Buildings Contents
BreezeCELL
iv
5 Frequency Allocations ...................................................................................... 7
6 MIMO Support .................................................................................................. 7
7 Monitoring & Control ....................................................................................... 7
7.1 Monitoring Elements ............................................................................................................ 8
8 Installation Requirements and Procedures ..................................................... 8
8.1 CATV System (if applicable) ................................................................................................. 8
8.2 Headend (Equipment Room) ............................................................................................... 8
8.3 Coax Plant (if applicable) ..................................................................................................... 9
8.4 Rooms (in case of CATV plant) ............................................................................................ 9
9 Headend Equipment Installation ..................................................................... 9
9.1 Connector Information ......................................................................................................... 9
9.1.1 UDC ................................................................................................................................. 9
9.1.2 CCD ................................................................................................................................. 9
9.2 Rack Installation ................................................................................................................. 10
9.3 Connecting the BreezeCELL Equipment ............................................................................ 10
9.4 Connecting the Monitoring System .................................................................................. 10
9.5 Connecting External Alarms .............................................................................................. 11
9.5.1 UDCs .............................................................................................................................. 11
9.5.2 Monitoring ..................................................................................................................... 11
9.6 Connecting the Base Stations ............................................................................................ 11
9.7 UDC Configuration ............................................................................................................. 11
9.7.1 BTS Attenuation Setting ................................................................................................. 12
9.7.2 Gain Configuration ........................................................................................................ 12
9.7.3 Frequency Configuration ................................................................................................ 13
9.8 Pilot Master/Slave Configuration ...................................................................................... 13