User Manual

Basic Installation
BreezeNET PRO.11 Series 2-3 User’s Guide
2.3.1. Additional Considerations When Positioning the
Access Point
When positioning the AP-10 PRO.11 and AP-10DE Access Points, take into
account the following additional considerations.
Height
Install the Access Point at least 1.5m above the floor, clear of any high
office partitions or tall pieces of furniture in the coverage area. The Access
Point can be placed on a high shelf, or can be attached to the ceiling or a
wall using a mounting bracket.
Central Location
Install the Access Point in a central location in the intended coverage area.
Good positions are:
In the center of a large room.
In the center of a corridor.
At the intersection of two corridors.
Many modern buildings have partitions constructed of metal or containing
metal components. We recommend that you install the Access Points on the
corridor ceilings. The radio waves propagated by the BreezeNET PRO.11
LAN are reflected along the metal partitions and enter the offices through
the doors or glass sections.
2.4. Connect the Unit to the Power Supply
The unit operates on a power input of 5V DC, (1200mA , 1500mA peak)
supplied by the power transformer included with the unit.
Plug the output jack of the power transformer into the DC input socket
on the unit. This socket may be located on the rear or side panel of the
unit.
Connect the supplied power transformer to a power outlet -
110/ 220VAC.