Installation guide

BreezeNET
®
B130/B300 GigE Quick Installation Guide
- 1 -
P/N: 215743 July 2010
WARNING:
The document is intended to be used by qualified RF engineers/technicians
and IT professionals. Qualified personnel should have skills and experience
in the following areas: outdoor/indoor radio equipment installation, outdoor
wireless networks, TCP/IP networking protocols, safety procedures and
instructions for installing antenna equipment, professional manage of
electrical equipment and accessories, safety procedures and instructions for
working on towers and heights.
WARNING:
The warranty is not spread for the devices which stopped working properly
due to improper usage, careless treatment, incorrect deployment or
exploitation. The warranty voids in the following cases: the device was
opened and/or repaired by the owner on his own, improper exploitation
conditions (including improper grounding), electrical damaging of the print
circuit board due to electric disruption caused by improper grounding,
mechanical defects of the case.
Installation Preparations
Components and accessories required for installation.
Indoor Unit (IDU)
Outdoor Unit (ODU)
Service cable for IDU-to-ODU connection. Service cable should be STP (or FTP) Category
5E cable. The total cable length between LAN equipment (behind IDU) and ODU should
not be longer than 100 meters.
One shielded and one unshielded RJ-45 connectors for service cable
Ethernet cable for connecting IDU to LAN equipment (use a straight for connection to a
hub/switch or a cross-over cable for connecting directly to a computer)

Summary of content (10 pages)