Service manual

Disassembly Procedures
Disconnect power source and shut off gas supply before
servicing, unless testing requires it.
WARNING
!
RS2310005 Rev. 0 20
Pressure Regulator and Low Voltage Oven/
Broil Gas Valve
NOTE: Due to location of Gas and Electrical
connections on the components. Range will
have to be moved forward for access.
1. Disconnect electrical supply to range.
2. Turn off or disconnect gas supply to range.
3. Using a floor protection pad move range forward. On
solid pipe connection the pipe must be first
disconnected from pressure regulator inlet
connection accessed through storage door area.
4. Remove bottom shield covering gas and electrical
connections.
5. If replacing PRESSURE REGULATOR disconnect
gas supply line at the pressure regulator.
6. Using a
9
/
16
–inch wrench, disconnect both pieces of
gas tubing from the PRESSURE REGULATOR.
7. Remove the screws securing the pressure regulator
to the support bracket.
8. Transfer any adapters/fittings to new pressure
regulator using the appropriate pipe sealant and
double wrenching to assure gas tight connection.
9. Reattach pressure regulator to mounting bracket.
Reconnect two pieces of tubing. Reconnect gas
supply.
NOTE: Verify shut-off valve lever on pressure regulator
is in the “OPEN” position.
10.Turn gas on and check for gas leaks using soapy
water on connections.
11.If replacing LOW VOLTAGE OVEN/BROIL GAS
VALVE it is not necessary to disconnect gas supply to
range.
12.Using a
9
/
16
–inch wrench, disconnect both pieces of
gas tubing.
13.Remove screws securing gas valve bracket to bottom
rear of range.
14.Carefully twist bracket/gas valve assembly to
disengage oven burner from burner orifice on gas
valve.
15.Pull assembly outward far enough to access the
bracket and gas valve.
16.Remove screws securing gas valve to bracket, then
secure new gas valve in its place.
17.Using a needle nose pliers transfer the PURPLE and
WHITE wires to the new gas valve utilizing the
3
/
16
–inch connections. These two wires are for the
BAKE circuit in the gas valve.
18.Using a needle nose pliers transfer the BROWN and
WHITE wires to the new gas valve utilizing the
1
/
4
–inch connections. These two wires are for the
BROIL circuit in the gas valve.
19.Reposition the bracket/gas valve assembly.
NOTE: Verify oven burner venturi is over the oven
burner orifice on the gas valve.
20.Reattach assembly to the range.
21.Using a
9
/
16
–inch wrench, reconnect both pieces of
tubing to gas valve.
22.Turn on gas supply to range and check gas
connections using soapy water solution. The BROIL
outlet fitting will have to be checked with gas turned
on, electric turned on, and clock timer set for BROIL.
NOTE: Verify oven door is closed to eliminate the three
minute broil “CANCEL” feature.
Broil Burner
1. Remove screws securing broil ignitor to broil burner.
2. Remove screws securing broil flame spreader to
oven cavity.
3. Remove broil burner and replace broil burner by
reversing procedures.
Bake Burner
1. Remove oven bottom, see “Oven Bottom” procedure.
2. Remove screws securing bake ignitor to bake burner.
3. Remove screws securing bake burner bracket and
the front of the bake burner to oven cavity.
4. Remove bake burner and replace bake burner by
reversing procedures.