HATS01 HATS02 HATS03 HATS04 HATS05 HATS06 HATS07 HATS08 HATS09
GUI(S,V)070 X X
GUI(S,V)090 X X
GUI(S,V)115 X X
GUI(S,V)140 X X
GCIS070 X X
GCIS090 X X
Low Pressure Switch "WC -0.37 -0.37 -0.37 -0.32 -0.27 -0.32 -0.32 -0.27 -0.23
High Pressure Switch "WC -0.66 -0.6 -0.55 -0.55 -0.46 -0.55 -0.46 -0.46 -0.37
Natural Gas Orifices (DMS) #44 #44 #44 #44 #44 #45 #45 #45 #45
GUIS, GUIV, GCIS High Altitude Charts
For 3,001 feet to 7,000 feet For 7,001 to 8,500 feet
Table 3
2. Replace natural gas orifices (Figure 3 & 4) with the
correct orifice kit depending on propane or natural gas
usage and the altitude at the installation site. Refer to
Tables 3, 4, and 5 for the appropriate kit required.
Orifices
Figure 3
Replacing Gas Orifices
Figure 4
Orifices
4. Reconnect the hose and wires. Reconnect wiring ac-
cording to the wiring diagram located inside the blower
compartment access panel.
5. Proceed with orifice installation.
III. Orifice Installation
CAUTION
To avoid the risk of fire, property damage,
or personal injury, shut off gas supply first,
then disconnect the electrical supply before
proceeding with conversion.
1. Remove the gas manifold by removing the burner box
front cover (not required on all models), cutting the wire
ties, disconnecting the gas valve low voltage wires, and
removing the four manifold mounting screws (see
Figure 2).
Burner Box
Front Cover
Manifold
Figure 2
Gas Manifold Removal