Jeeves Installation Guide

1 of 3
JEEVES INSTALLATION INSTRUCTIONS
* Please read the Safety Measures before installing your Jeeves Heated Towel Rail.
* All installations should be in accordance with National and Local electrical codes.
* The Heated Towel Rail should be installed by a certified electrician.
* To ensure the Heated Towel Rail is mounted securely, fasteners should be secured in
studs, or alternatively, in structural members that are placed behind the rails.
Step 1
Attach the 4 stainless steel tube assemblies (a) onto the unit as
shown in Fig 1. Allow the set screw to face downwards.
Install and secure one slotted bolt (b) through the center of the
white bushing, threading it onto the nut welded on the unit.
Step 2
Decide where to install unit and the location of the single gang
junction box. This can be done by either placing the assembled
rail against the wall or taking approximate dimensions from the
drawing supplied.
Remember: Unit should not be mounted closer than 2 inches below an overhanging surface
(i.e. shelf) and no closer than 1-1/4 inches above the floor and/or baseboard.
Step 3
Install single gang junction box in the desired
position. Secure supplied cover plate onto box.
Place unit against wall with wire cover tube inserted
in cover plate. To achieve this, the cord needs to be
fed through the slot at the end of the tube. Make
sure that the unit is mounted squarely. Use a pencil
to lightly mark the position of all four tubes. Fig 2.
Step 4
Remove unit and center
the marking disk in the
circles marked on the wall
in Step 3.
Place the tapered bushing
(c) onto the center of the
circles marked in Fig 3.
and insert supplied screw
through center of the
tapered bushing and fasten
to wall as in Fig 4.
If rail is installed on a tiled
surface use a toggle bolt
anchor.