Install guide

Chapter 2. Installing the Battery Backup Unit
30 3ware 9590SE Serial ATA RAID Controller Quick Install Guide
Figure 23. Removing the power cable from the BBU module
7 If you removed the BBU control module in step 6, reattach it
now.
8 Insert the new battery module that you received from AMCC
and cable it up.
9 Reinstall the 3ware RAID controller, close up your system, and
restart it.
10 Run a battery test to compute the estimated battery capacity of
this new battery.
You can run the battery test from the BBU page of either 3BM
or 3DM 2, or by using the 3ware CLI. For detailed instructions,
see the 3ware Serial ATA RAID Controller User Guide and the
3ware 9000 Series Serial ATA RAID Controller CLI Guide.
Press down on the
lever-like clip and pull
the connector out.