1.) Place unit into alcove and onto grout bed.
2.) Check unit for level and plumb while continually working unit into grout bed.
3.) Place a 2x4 (7” long) on the bottom of the unit. Be sure to place a towel or cardboard between unit 
and wood so as not to scratch acrylic.
4.) Place a brace between the 7” long piece of 2x4 and a ceiling member. is will assure positive contact 
with the oor while also placing the drain sump in it’s proper postion.
5.) Inspect Unit for High Spots In Bottom (Adjust Brace If Needed).
6.) Secure unit to framing members. Wait until grout has cured before anchoring the back and top side 
wall nailing anges.
7.) Leave Brace In Place Overnight To Allow Grout To Cure.
8.) Remove Brace.
INSTALLATION OF AN OPEN TOP 
ONE PIECE TRANSFER SHOWER 
BE SURE TO USE A NON-SHRINK GROUT
(MIX GROUT EXTRA WET)