Installation Guide

www.AmeriBath.com
Page 8
10/16
1.) Place unit into alcove and onto grout bed.
2.) Check unit for level and plumb while continually working unit into grout bed.
3.) Place a 2x4 (7” long) on the bottom of the unit. Be sure to place a towel or cardboard between unit
and wood so as not to scratch acrylic.
4.) Place a brace between the 7” long piece of 2x4 and a ceiling member. is will assure positive contact
with the oor while also placing the drain sump in its proper postion.
5.) Inspect Unit for High Spots In Bottom (Adjust Brace If Needed).
6.) Secure unit to framing members. Wait until grout has cured before anchoring the back and top side
wall nailing anges.
7.) Leave Brace In Place Overnight To Allow Grout To Cure.
8.) Remove Brace.
INSTALLATION OF AN OPEN TOP
ONE PIECE TRANSFER SHOWER
BE SURE TO USE A NON-SHRINK GROUT
(MIX GROUT EXTRA WET)