Installation Guide

1.) Measure Inside He1qht from Drain Sump To Top Of Unit. Unit Should Measure
Between 80 1/2” TO 80 3/4”.
2.) Cut 2x4 for Top Approximately 18”. (Can Be Longer Providing Area On Top Is at).
3.) Cut 2x4 for Drain 7 1/2” Long.
4.) Cut Bracing Member (2x4) To Length (Minus 3” For Drain and Top Members In Steps 2 and 3)
5.) Place Unit In Grout Mixture.
6.) Check Unit for Level and Plumb While Continually Working Unit Into Grout Bed.
7.) Secure Unit To Framing Members.
8.) Place Brace In Shower. Be Sure To Place A Towel Between Unit And Wood So As Not To Scratch
the Acrylic.
9.) Inspect Unit for High Spots In Bottom (Adjust Brace If Needed).
10.) Leave Brace In Place Overnight To Allow Grout To Cure.
11.) Remove Brace.
INSTALLATION OF A CLOSED TOP
BARRIER FREE TRANSFER SHOWER UNIT
BE SURE TO USE A NON-SHRINK GROUT
(MIX GROUT EXTRA WET)
www.AmeriBath.com
Page 8
10/16