Installation Guide

6
PAN & WALL THRESHOLD TRIM
TIME REQUIRED
1/2 - 1 HR
8
diagram 10
diagram 11
cement
board
diagram 9
diagram 6
diagram 8
metal pan
Threshold for Door
A - Pan Threshold
1. Locate the threshold pieces
(dia. 6& 7)
2.
Dry fit thresholds onto the front of the metal pan. The Door threshold
does not have a channel in it. The door rail is reversible and can be
placed on the left or right. (dia. 8)
3.
Remove and place 100% RTV silicone in the Pan where the bottom of
thresholds rest, and in the bottom channels under the thresholds, re-
install thresholds into pan.
4.
There will be a small gap between the bottom of thresholds and
the floor, this can be grouted later if it is still exposed after installing
bathroom flooring.
B - Glass Door and Glass Panel Casing Trim
1. Locate
Locate
2.
4.
5.
6.
silicone
TD
P
diagram 7
metal pan
threshold for panel
silicone
P
TD
TP
metal pan P threshold for door
Threshold for Panel
TP
Door side Casings (3)
& Cap
CD
panel channel side
Casings (
3) & Cap
CP
CD
CP
glass door side casing.
glass panel channel side casing & cap. (dia. 9)
silicone
(reversible)
Install TD & TP with inward slope so any water will drain back into the pan.
To help with the side casing installation, use a level and draw a
plumb line from the inside of the pan threshold up to the top of the
shower. Do this on both sides. This line will be where the side casings
and the wall Panels meet, this will give you a visual reference point
when dry-fitting your wall panels.
Apply 100% RTV silicone, using a circular pattern, to the cement
board along the plumb line, approximately 4 inches wide, to the
edge of the shower pan.(dia. 10)
Place the first side casing into position making sure to align the side
rail with the vertical plumb line previously drawn on the cement
board. Apply pressure to the side casing to bond it to the cement
board. The side casing will be flush with the inside of the shower pan
threshold and have a small gap where the pan threshold slopes.
(dia. 11). You can shim the gap if needed.Make sure to also align the
channels.
Place the remaining side casings into position, 3 to each side and
cap. Use a level and the plumb line previously drawn on the cement
board to align the side casings vertically.
TP
TD
flush with threshold
small gap