Installation Guide

WALL PANEL/LINER INSTALLATION (continued)
TIME REQUIRED
3-4 HR
10
C - Installing Panels
1.
2.
3.
Press the wall firmly into position. Be sure to use spacers between
the bottom panel and the shower pan to ensure panel is level.
(dia. 17)
4.
Install the panels in the same order as you dry-fitted the panels.
B races may be required to keep walls flush
diagram 17
OPTIONAL SHAMPOO SHELF INSTALLATION
TIME REQUIRED
1/2 - 1 HR
11
4.
On the 2 tiles the Shampoo Shelf will be replacing,
mark 1” from the outside of the grout line, the cut-
out area will be 10” x 22”. Cut out the hole for the
Shelf. The smaller the hole the better.
5.
Dry-fit the Shampoo Shelf for alignment of grout
lines.
6.
Using 100% RTV Silicone in-place with a generous
bead around the back of the lip, wipe off excess
silicone with tissue.
1.
The Shampoo Shelf was designed to match your tile
size. 12” x 24” tiles, the cut-out hole size is 10 x 22”.
2.
There is a 1” lip or frame around the Shampoo Shelf,
this will be the water sealed area for the Shampoo
Shelf.
3.
The best way to cut the hole is with a small 5” round
diamond blade and with a jigsaw to cut the corners.
See detailed instructions enclosed with Shampoo
Shelf
8
WB3
L3
WT3
L2
WB2
WB1
L1
WT1
WT2
Remove all dust and dirt with a clean dry cloth. This will increase
the bond to the 100% RTV silicone.
Start with the bottom panel
WB2
apply a generous amount of 100%
RTV silicone to the cement board and to the back side of the wall
panel. Refer to the manufacturer’s recommendations for
application and drying time.