Installation Guide




his shower system is designed to be installed on a leel, bare floor t is necessary for any eisting shower to be
completely remoed ear out and remoe all old material to epose the wall studs lean up the shower
area, remoing all dust and old material from the area
o ether r e recommend not installing your shower below the temperature of  he shower
will be fine in cold weather after installation, but during installation bending and handling shower components
in cold weather can cause breaage rigid conditions can mae some shower components brittle and
susceptible to cracing during rough installation handling
DTTN T N
 
to 
/ cement board
   stud
metal flange
pan
diaram 
floor of pan
silicone bead
t is easier to chec alignment of studs and pan without the
drain installed into the pan
lace the pan in the planned position hec to see that
the spacing between the metal pan flange and studs
are flush ome shimming or sanding of the studs may
be reuired to flush the studs with the metal pan flange
hen screwing in the / cement board the metal flange
will pull fast to the studs, and will secure the metal pan in
place dia.
D
 
