Installation Guide

 NN NTTON
 
 
A I W L
nspecting panels at this point will gie you confidence that the wall panels are straight and suare from the
factory hen installing wall panels, you may need to mae adjustments to the panels to accommodate for
uneenness of your eisting walls uring the inspection process and/or dry-fitting process, if you hae any
concerns about the alignment or fit of the wall panels, please call us and we will gladly assist you with your install

ind a large flat area to layout and inspect all panels

lign all panels and liners to chec for straightness ae sure grout lines are straight and suare to each
other

istine tone wall panels are made to be fleible and may hae a slight bow his condition is normal and wall
panels will flatten out when properly installed f wall panels hae been stored improperly or hae become
ecessily bowed, they can be corrected before installation
ee troubleshootin section on last ae or details
B   W L



lace your first bottom bac panel
 into position dia est onto the
pan floor use spacers between the floor and the panel to mae the top of
the panel leel
lace the bac liner  into position ae sure the grout lines are aligned,
use spacers to mae the top leel nspect the spacing between the wall
panels and the side threshold plumb line
lace the top panel
 into position, push the two panels together ae
sure the grout lines are aligned, use spacers to mae the top of the panel
leel nspect the spacing between the wall panels and the side threshold
plumb line
epending on your cement board alignment, some sanding of the wall
panel edges may be reuired for a tight fit


S     No you  he for
eee  rout e et   etee   u e
diaram 
diaram 

olding the upper panels and liner in place with another persons help,
chec the length and oerlap alignment ome fitting may be reuired
lace one of the bottom side panels  into position and chec for
leelness and length
 lace the side liner  into position dia 
 lace one of the top side panels

into position
 epeat steps through for other side of shower
 epending on your faucet selection, you may need to mar and cut
out holes for your faucet and other accessories
ie shampoo shelf to fit
through before you can place the panel into position emember
measure twice, cut once, you can cut our walls with most cutting tools


T

