Installation Guide

WALL PANEL/LINER INSTALLATION (continued)
TIME REQUIRED
3-4 HR
10
C - Installing Panels
8. Sand the backside surface of the wall panels with 60 grit sandpaper. This will increase the bond
to the silicone. Remove all dust and dirt with a clean dry cloth.
9. Start with panel , apply a generous amount of silicone to the cement board and to the
back side of the wall panel. Refer to “Silicone Recommendations” on previous page for
applying silicone. Also refer to the manufacturer’s recommendations for application and drying
time.
10. Press the wall firmly into position. Be sure to use spacers between the bottom panel and the
shower pan to ensure panel is level. (diagram 16)
11. Install the remaining panels in the following order:
Match the space between the panels with the rest of the grout lines on the panel. Use spacers if
necessary to make the walls square and straight.
B races may be required to keep walls flush
diagram 16
OPTIONAL SHAMPOO SHELF INSTALLATION
TIME REQUIRED
1/2 - 1 HR
11
4. On the 2 tiles the Shampoo Shelf will be replacing, mark 1”
from the outside of the grout line, the cut-out area will be
10” x 22”. Cut out the hole for the Shelf. The smaller the
hole the better.
5. Dry-fit the Shampoo Shelf for alignment of grout lines.
6. Silicone in-place with a generous bead around the back of the
lip, wipe off excess silicone with tissue.
1. The Shampoo Shelf was designed to match your tile size.
(2) 12” x 12” tiles, the cut-out hole size is 10 x 22”.
2. There is a 1” lip or frame around the Shampoo Shelf, this will
be the water sealed area for the Shampoo Shelf.
3. The best way to cut the hole is with a small 5” round
diamond blade, and with a jigsaw to cut the corners.
See detailed instructions enclosed with Shampoo Shelf
W1
W2
W2
W1
W3
W4
W2
W2
W4
W2
W1
W3
W1