Smart-UPS® VT 10-30 kVA 208/220 V Site Preparation and Installation Manual
Smart-UPS® VT 10-30 kVA 208/220 V Site Preparation and Installation Manual IMPORTANT SAFETY INSTRUCTIONS – SAVE THESE INSTRUCTIONS This manual contains important instructions for the SUVT series that should be followed during installation and maintenance of the UPS and Batteries Smart-UPS® VT 10-30kVA, 208V, Site Preparation and Installation – 990-1598A 1
Contents Safety .....................................................................1 General Safety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Symbols used in this guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Environmental symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 General safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Introduction ............................................................
Basic Wiring Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Site Preparation Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Mechanical assembly ............................................ 18 Stabilizing Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Leveling Feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Floor Anchoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety General Safety Instructions This guide contains important instructions that should be followed when handling the UPS, Battery Enclosures, and batteries. Symbols used in this guide WARNING! Risk of electric shock. CAUTION! Read this information to avoid equipment damage. Indicates important information. Note Indicates that more information is available on this subject in a different section of this manual. Indicates that more information is available on the same subject in a different manual.
Safety – General Safety Instructions General safety WARNING! All electrical power and control wiring must be installed by a qualified electrician and comply with local and national codes. WARNING! When connected, the UPS contains energy from both AC and DC sources. If the UPS has dual mains supply, be aware of the two AC supply sources. Risk of electric shock parts inside the UPS are energized from the battery supply even the AC power is disconnected.
Introduction Welcome to the Site Preparation and Installation Manual for the Smart-UPS® VT. This manual contains information on how to prepare your site for the installation of the UPS and optional APC equipment (also available at www.apc.com) and instructions on how to carry out the electrical/ mechanical installation. Separate manuals are available on: • Receiving and Unpacking - part no. 990-1747 • Operation - part no. 990-1599 Keep the UPS free from loose objects to prevent obstruction of the airflow.
UPS Family Range and Components 13.85 in/352 mm Enclosures ! Output Pwr Zone Probe 10/100Base-T Reset AP9619 10/100 Network Management Card EM Serial: Model: BATTER Y UNIT Serial: Model: BATTER Y UNIT Serial: Model: BATTER Y UNIT Serial: Model: BATTER Y UNIT Serial: Model: BATTER Y UNIT Serial: Model: BATTER Y UNIT Unit Serial No Hotline in Hotline US/Canada/LA in EMEA: Worldwide M: +1 Support+353 91 70 800 800 4APC numbers: 2000 APC SKU www.apcc.
Introduction – UPS Family Range and Components Serial number The serial number is available on the type label on the rear side of the UPS. Type label Hotline in US/Canada/LAM: +1 800 800 4APC Hotline in EMEA: +353 91 70 2000 Worldwide Support numbers: www.apcc.com/support/service/geomap_world.dfm Model APC SKU Unit Serial No 7.2Ah SUVT10KF2B2S APC Smart-UPS VT 10kVA 208/220V w/2 Batt. Modules 14.4Ah SUVT10KF1B4S APC Smart-UPS VT 10kVA 208/220V w/1 Batt. Module Exp. to 4 7.
Introduction – UPS Family Range and Components User interface ! Output Pwr Zone Probe 10/100Base-T Reset 10/100 AP9619 Network Management Card EM Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Mo
Introduction – UPS Family Range and Components Display port for the connection of display communication cable. Documentation storage. Inlet for communication cables. Connection Interface (rear) Upper Cover Plate rear. Upper part of Conduit Box.
Introduction – UPS Family Range and Components Lower part of Conduit Box. Power connection. Communication wiring connection (EPO signalling, Battery Temperature Sensor). Protective earth. Foot print Rear Rear 36.45 in/ 926 mm 20.59 in/523 mm 13.85 in/352 mm Conduit Box. Levelling feet. Castors. Communication cable inlets.
Introduction – UPS Family Range and Components APC Network Management Card AP9619 (installed in UPS) and APC Humidity Sensor (Optional) Humidity Sensor ! Output Pwr Zone Probe 10/100Base-T Reset 10/100 AP9619 Network Management Card EM For installing Humidity Sensor see “Connection of APC Humidity Sensor” on page 40.
Site Preparation Installation Space Requirements Clearance for 20.59 in/523 mm Enclosures (A) (B) UPS Conduit Box (F) (C) (D) (G) (E) Space requirements in mm Minimum clearance above Enclosure (A) 20.00 508 Enclosure depth (B) 32.99 838 Enclosure width (C) 20.59 523 Minimum rear service clearance* (compliant with NEC 110.26 for North America) (D) 36.00 914 Minimum front clearance (E) 40.00 1,000 Conduit Box, depth (F) 3.
Site Preparation – Installation Space Requirements Clearance for stand-alone 13.85 in/352 mm Enclosures (A) (B) UPS Conduit Box (F) (C) (D) Stabilizing Bracket, left and right (G) (E) Space requirements in mm Minimum clearance above UPS (A) 20.00 508 UPS depth (B) 32.99 854 UPS width 13.85 352 Minimum rear service clearance* (compliant with NEC 110.26 for North America) (D) 36.00 914 Minimum front clearance (E) 40.00 1,000 Conduit Box, depth (F) 3.
Operating Environment Operating conditions Install the UPS in an indoor, temperature-controlled area, free of conductive contaminants.
Site Preparation – Operating Environment Recommended current protection AC output over-current protection and AC output disconnect must be provided by the customer.
Site Preparation – Operating Environment Minimum breaker settings for 15 kVA UPS Overload Event Mains input Bypass input Output Duration Notes Internal fault 2.5 kA 2.
Site Preparation – Operating Environment Recommended phase-conductor sizes [AWG] for a 86°F (30°C) temperature environment UPS/AWG sizes Mains input [AWG] AC output [AWG] DC input [AWG], 75°C Wire 10 kVA 8 8 1 15 kVA 6 6 1 20 kVA 4 4 1 30 kVA 1 1 1 Use Molex lug type or equivalent, and crimp to manufacturer’s specifications. Note Cable Size [AWG] Cable Lug Type Crimping Tool Die Terminal Bolt Diameter 12 YA12CL2TC38 MD7-34R W12CVT 0.
Basic Wiring Overview Maintenance Bypass Panel AC input power (Optional Equipment) DC power Communication Interface EPO EPO AC power (output) XR Enclosure(s) (Optional, 4 Max.
Site Preparation Checklist System components. Have you – determined minimum battery run time requirement based on load (kW and kVA) and selected the proper number of APC XR Enclosures (SUVTBXR2B6S, SUVTXR2B6S and SUVTBXR6B6S, SUVTXR6B6S) and Battery Unit (SYBT1). Always install a whole Battery Module (4 Battery Units) at a time. considered Service Program or Extended Warranty plan? Site Preparation.
Mechanical assembly Stabilizing Brackets Always install the Stabilizing Brackets on the 13.85 in/352 mm Enclosure (shipped with the UPS) to enhance the stability of the Enclosure. Attach the Stabilizing Bracket to the UPS Enclosure re-using the screws used to secure the UPS to the pallet during shipment.
Leveling Feet Verify that the installation has been electrically wired before setting the leveling feet. Note Setting the leveling feet Set the leveling feet to ensure the UPS is horizontal when it is in its final operating position. Use a 13/ 14-mm wrench (shipped with UPS) to adjust all 4 leveling feet from front to back, and left to right, until the pads make solid contact with the floor. Use a bubble level to check the Enclosure is horizontal.
Floor Anchoring Note If floor anchoring is required in your area, read this section. If not, proceed to Operating Environment. However, if you install a 13.85 in/352 mm Enclosure, it must always be equipped with the Stabilizing Bracket for enhanced stability (not necessary to bolt the Stabilizing Bracket to the floor in non-seismic areas).
Mechanical assembly – Floor Anchoring Recommended minimum number of floor bolts per Enclosure: 4 (1 in each corner). Recommended floor bolt size: 5/16(3/8) in/8 mm. Note Floor anchoring of stand-alone systems In seismic areas, it is recommended that the installation be bolted to the floor, and that the batteries be secured in the Enclosure by the Battery Securing Brackets. For floor anchoring, use the 2 transport brackets that were used to secure the UPS to the pallet during transport.
Electrical Installation System-Electrical Information WARNING! All electrical power and power control wiring must be installed by a qualified electrician, and must comply with local and national regulations for maximum power rating. 10 kVA 8 kW 15 kVA 12 kW 20kVA 16 kW 30 kVA 24 kW Input voltage / Bypass voltage (V) 3-phase 208Y/ 120 V 3-phase 208Y/ 120 V 3phase 208Y/ 120 V 3-phase 208Y/ 120 V Input current (nominal, per phase) (A) 24.3 36.5 48.2 72.
Electrical Installation – System-Electrical Information 10 kVA 8 kW 15 kVA 12 kW 20kVA 16 kW 30 kVA 24 kW Input voltage / Bypass voltage (V) 3-phase 220Y/ 127 V 3-phase 220Y/ 127 V 3-phase 220Y/ 127 V 3-phase 220Y/ 127 V Input current (nominal, per phase) (A) 22.9 34.6 46.5 68.9 Maximum input current per phase (continuous, at minimum mains voltage) 25.2 38.0 50.1 75.
Electrical Installation – System-Electrical Information Source connections WARNING! The UPS must be supplied from a 208Y/120 V or 220Y/127 V 4W + GND 60Hz source. CAUTION! Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection is present. For recommended “Recommended current protection” , see The Site Preparation section. CAUTION! The installation must comply with all local and national codes. Refer to NEC Articles 310-15, 310-16 for further information.
Electrical Installation – System-Electrical Information One-line diagram for Smart-UPS VT 10, 15, 20, 30kVA, 208V, 3 phase, single mains Utility source (provided by others) 3PH 208Y/120V 4 wire + ground 1 MIB 10kVA, 35A.T. 15kVA, 60A.T. 20kVA, 80A.T. 30kVA, 125A.T. 10kVA, 27.8A 15kVA, 41.7A 20kVA, 55.6A 30kVA, 83.3A 2 Maintenance Bypass Panel 10kVA, 27.8A 15kVA, 41.7A 20kVA, 55.6A 30kVA, 83.3A Q1(UIS) 3P 10kVA, 27.8A 15kVA, 41.7A 20kVA, 55.6A 30kVA, 83.
Electrical Installation – System-Electrical Information One-line diagram for Smart-UPS VT 10, 15, 20, 30kVA, 220V, 3 phase, single mains Utility source (provided by others) 3PH 220Y/127V 4 wire + ground 1 MIB 10kVA, 35A.T. 15kVA, 60A.T. 20kVA, 80A.T. 30kVA, 125A.T. 10kVA, 26.2A 15kVA, 39.4A 20kVA, 52.5A 30kVA, 78.7A 2 Maintenance Bypass Panel 10kVA, 26.2A 15kVA, 39.4A 20kVA, 52.5A 30kVA, 78.7A Q1(UIS) 3P 10kVA, 26.2A 15kVA, 39.4A 20kVA, 52.5A 30kVA, 78.
Electrical Installation – Wiring Wiring Make sure the UPS is in its location of use before wiring begins. Note CAUTION! Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection is present. Power terminal lug diameter: minimum 0.2 in/6 mm. Torque value: 45 lbf-in/7Nm. Note If floor anchoring is required, attach the Floor Anchoring Brackets to the UPS now. Follow step 1 under Floor Anchoring (Option).
Input/Output Wiring – Single Mains (default) The UPS is designed for both single (default) and dual mains installations. Follow the below steps to install the UPS in a single-mains installation. The illustrations show a 20.59 in/523 mm Enclosure, but installation procedures are identical for 13.85 in/352 mm Enclosures).
Loosen the (4) M4 screws (2 each side) from the bottom part of the Conduit Box and remove. Punch 2 holes in the marked areas of the Conduit Box bottom to fit the size of the conduit pipes, and reattach the Conduit Box bottom to the Enclosure, re-using the (4) M4 screws. Install conduit pipes in the Conduit Box. Run cables through the conduit pipes and the bottom of the Conduit Box, pull behind the bar and up into the input/output area.
Input/Output Wiring – Dual Mains The UPS is designed for single mains installation as default. Follow the below instructions to install the UPS in a dual-mains installation The illustrations show 20.59 in/523 mm Enclosures, but the installation procedures are identical for 13.85 in/352 mm Enclosures).
Electrical Installation – Input/Output Wiring – Dual Mains Punch 3 holes in the Conduit Box bottom to fit the size of the conduit pipes, and reattach the Conduit Box bottom to the Enclosure, re-using the (4) M4 screws. Install conduit pipes in the Conduit Box bottom. Run cables through the conduit pipes and the bottom of the Conduit Box. Guide the cables behind the bar and up into the input/output area.
External Battery Wiring Wiring to battery bank or battery racks L1 L2 L3 N L1 L2 N L3 L1 L2 Bat+ L3 N N N Bat- Attach DC cables to upper part of busbars as shown. For configurations including customer-supplied external batteries, refer to manufacturer’s battery installation and maintenance instructions.
Communication Wiring to EPO and Optional Equipment EPO switch must be connected to a NEC Class 2 wiring. Note Note Use only 28-16AWG copper wire for the connection of the Emergency Power Off (EPO) and other optional equipment. Keep all other wiring and uninsulated live parts separate of other NEC Class 2 circuits. Do not connect any circuits to the EPO terminal block unless it can be confirmed that the circuit is a NEC Class 2 circuit.
Electrical Installation – Communication Wiring to EPO and Optional Equipment Pin connections J106 (XR Enclosure) and J108 (EPO) L1 L2 L3 N N L1 L2 L3 J106 Pin Connections: 8 Ext. charging control return 7 External control of charging 6 Q3 active return J108 Pin Connections: 5 Q3 active 1 Normally open EPO 4 Battery measurement supply* 2 Normally open EPO return 3 Battery unit quantity* 3 Normally closed EPO 2 Max.
Electrical Installation – Communication Wiring to EPO and Optional When connecting the Q3 auxiliary signal, use gold-plated N/C auxiliary switch on Q3. Note XR Enclosure, APC Maintenance Bypass Panel, and Generator Control wiring J106 8 Charging control switch 7 6 Q3 switch 5 4 4 3 3 2 2 1 1 J200 (XR Batteries) Pins 1 through 4 are for battery measurement (only applicable to APC XR Enclosures). Pins 5 through 6 are for external maintenance bypass Q3.
Electrical Installation – Communication Wiring to EPO and Optional Equipment Pin connections J108 (for EPO wiring options) EPO switch wiring. The UPS must be connected to either a dry contact or a 24VDC Emergency Power Off (EPO) switch. Connect the EPO cable, using one of the following 4 wiring configurations.
Connection of APC Humidity Sensor Front panel removal ! Output Pwr Zone Probe 10/100Base-T Reset 10/100 AP9619 Network Management Card EM Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT Serial: Model: BATTERY UNIT
Electrical Installation – Connection of APC Humidity Sensor The Humidity Sensor is provided in a plastic bag attached to the front of the UPS.
Electrical Installation – Connection of APC Humidity Sensor Guide the cable up alongside the side panel and insert the Humidity Sensor plug into the socket marked “Probe”. Fasten the cable to the side panel with enclosed cable ties. Remount the cable-inlet plate. Place the Humidity Sensor where applicable.
Wiring Verification Procedure Do not connect batteries in the UPS. Note Use following procedure to verify that the UPS has been wired properly: 1. If your installation includes an XR Enclosure, make sure that the DC breaker (if available) is in the OFF position and that both 125A fuses are removed from the XR Enclosure. 2. Check that the power wiring is torqued to 45 lbf.in/7Nm. 3.
Installation Site Checklist This checklist should be completed by the electrician after the wiring has been completed: Installed at (company name, date, contact)__________________________________________ Name and telephone number of electrician: ___________________________________________ UPS serial number: ______________________________________________________________ Input Circuit Breaker size and type: _________________________________________________ Output fuse size and type: _____________________
APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests. – www.apc.com (Corporate Headquarters) Connect to localized APC Web sites for specific countries, each of which provides customer support information. – www.apc.com/support/ Global support searching APC Knowledge Base and using e-support.