Installation Guide

Page | 1
POLYURETHANE CROWN MOULDINGS INSTALLATION
TOOLS:
Measuring tape
Fine tooth saw & Mitre box or
compound mitre box
Pencil
Safety goggles
Safety mask
Hammer or finishing nailer
Putty knife
Coping saw
Caulking gun
Paint brushes
MATERIALS:
Nails
Polyurethane Crown moulding
Premium Polyurethane
construction adhesive
Painters Caulk
Clean cloth or sponge
High quality Acrylic latex or Oil
based paint
220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Crown polyurethane
mouldings.
WALL AND CEILING PREPARATION
Prior to installing Crown mouldings make sure walls and ceilings are
dust free
dry
grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing American Pro Décor’s Polyurethane Crown mouldings,
make sure mouldings and adhesives are placed at room temperature 24
hours before installation. This allows material to adjust to the temperature
of the room to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50°
to 95° Fahrenheit

Summary of content (2 pages)