Installation Guide

Page | 1
POLYURETHANE BASE MOULDINGS INSTALLATION
TOOLS:
Measuring tape
Fine tooth saw & Mitre box or
compound mitre box
Pencil
Safety goggles
Safety mask
Hammer or finishing nailer
Putty knife
Caulking gun
Paint brushes
Level
MATERIALS:
Nails
Polyurethane Panel mouldings
Premium Polyurethane
Construction adhesive
High quality all Acrylic latex or oil
based paint
Painters Caulk
Clean cloth or sponge
220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Polyurethane Base mouldings.
WALL AND CEILING PREPARATION
Prior to installing base mouldings make sure walls are
dust free
dry
grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing American Pro Décor’s Polyurethane Base mouldings, make
sure mouldings and adhesives are placed at room temperature 24 hours
before installation. This allows material to adjust to the temperature of the
room to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50°
to 95° Fahrenheit
PAINTING
Mouldings can be painted either before installation or after. It is up to the
installer.

Summary of content (2 pages)