Installation Guide

Page | 1
HIGH DENSITY RECYCLED POLYSTYRENE
(RPS) CROWN MOULDINGS INSTALLATION
TOOLS:
Measuring tape
Fine tooth saw & Mitre box or
compound mitre box
Pencil
Safety goggles
Safety mask
Hammer or finishing nailer
Putty knife
Coping saw
Caulking gun
Paint brushes
MATERIALS:
Nails
Recycled Polystyrene Crown
moulding
Locktite® Power Grab® Ultimate
Construction Adhesive or
Liquid Nails Heavy Duty
construction adhesive LN-901
High quality all Acrylic latex-based
paint
Painter's All-Purpose Acrylic Latex
Caulk
Clean cloth or sponge
220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Crown Recycled Polystyrene
mouldings.
WALL AND CEILING PREPARATION
Prior to installing Crown mouldings make sure walls and ceilings are
dust free
dry
grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing American Pro Décor’s Recycled Polystyrene Crown mouldings,
make sure mouldings and adhesives are placed at room temperature 24 hours
before installation. This allows material to adjust to the temperature of the room
to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50° to 95°
Fahrenheit

Summary of content (2 pages)