Full Product Manual

American Spa Owner’s Manual
LTR50001143, Rev. M
Preparing for Your New Portable Spa
10
6. Install the lter into the lter canister.
Make sure the lter has soaked at least 30 minutes
before you install it.
7. Adjust water chemistry.
Test and adjust the water chemistry. See the section on page 23 for instructions on water clarity.
8. Let the spa heat up.
When the spa has nished priming, the heater will activate. Put the cover on and let the spa heat to the
set temperature.