Installation Guide

3
4
5
2
7
8
9
10
730431-100
6
Cut opening 1-1/2" inside
the perimeter line
of the lavatory.
Perimeter
of lavatory
Cutout
1-1/2"
On underside of countertop,
locate mounting hardware
holes as shown 1-7/8"
outside of cutout.
LOCATION OF CLIPS
1-7/8" TYP.-4 PLACES
45
˚
LOCATION OF MOUNTING HOLES
3/4 MIN.
Drill 1/8 dia. X 3/8 deep
#10 Wood Screw
3/4 MIN.
Clip
Drill 3/8 Dia .X 1/2 deep hole
Brass insert, epoxy
in place with threaded
end exposed. (Epoxy
not supplied).
Clip
#10-24 Mach. screw
INSTALL MOUNTING HARDWARE
FOR MARBLE OR SOLID SURFACES
FOR WOOD
A
Mount the drain assembly (not included)
on the lavatory, following faucet
manufacturer's instructions. Be certain
to apply a bead of sealing putty on the
underside of the drain (Part "A") in
order to ensure a watertight seal
between the lavatory and drain. Remove
excess putty after installing drain on
lavatory.
Center bowl over cutout and tighten
screws (see 4) to secure bowl to
countertop. Remove excess sealant
from inside lip.
After checking fit and
alignment of lavatory to cut
out, apply a bead of silicone
adhesive to rim of lavatory.
B
C
Shut-Off Valves
Connect supply line to faucet
(finger tight) and carefully bend
tubes to engage with the supply
shut-off valves. Tighten
connections at faucet and shut-off
valves for water tight seal.
Connect trap to drain assembly
hand tight to check alignment. It
may be necessary to cut off part
of the tailpiece (area "B") or part
of the horizontal leg of the trap
(area "C"). Secure joints for
watertight assembly.
Install faucet (not included)
and countertop (not included)
following manufacturers
instructions.