Installation Guide

TOWNSQUARE
Certified to comply with ANSI A112.18.1M
ROUGHING-IN
DIMENSIONS
Required Tools
Wrench
(Supplied)
Turn off hot and cold water supplies before beginning.
CAUTION
1
2
Insert SPOUT SHANK (1) through center hole of MOUNTING LEDGE.
Make sure that the RUBBER RING (2) is properly seated in RECESS
at base of SPOUT (3).
Assemble RUBBER WASHER (4) and BRASS WASHER (5) onto
SHANK (1). From underside of ledge secure SPOUT (3) into position
with LOCKNUT (6).
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
Adjustable Wrench
Channel Locks
2555.900
2555.901
Flat Blade Screwdriver
VALVE inlet is 3/4-inch NPT male connector.
NOTE
2
ADJ. 6-1/2 TO 12
4
3
1
3
4
5
RECESS
3
1
2
4
6
5
MOUNTING
LEDGE.
MOUNTING
SURFACE
8-1/4
3-5/8
4
ADJ. 6-1/2 TO 12
1-1/2 MAX.
1-1/4
MAX.
1-3/16 D.
3
(H)
(C)
1-1/8 D.
3/4-14 MALE
N.P.T. INLETS
12 MAX
1-1/16 D.
Phillips Screwdriver
M968788 Rev. 1.2
DECK-MOUNT BATH FILLER
Installation
Instructions
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.

Summary of content (3 pages)