Installation Guide

754748-100 Rev. B
6
5
A) Apply a bead of tub surround adhesive down each stud that will come in contact with the side panels being sure to stay below the line
previously marked.
B) Lay a bead of sealant along side panel mating surface and tub ledge.
C) Align the top nailing flange of each side panel with pencil line marked. Press firmly into place to ensure proper adhesion to studs.
Check alignment with all mating surfaces and reposition if necessary.
D) • Locate and drill a clearance hole in the center of the top nailing flange and centered on each stud (see arrows as shown).
• Also drill clearance holes in the front nailing flange on each side panel at approx. 12" intervals, centered on the flange
(see arrows as shown).
• Install galvanized screws through each hole and into the studs, securing the wall panel.
Tub Surround
Adhesive (studs)
Sealant
(side panel
mating surface)
Pencil line
Drill clear
an
ce
holes for
screws
Sealant (tub edge)