Installation Guide

755578-100 Rev. 4 02/20
Product names listed herein are trademarks of AS America Inc.
© AS America Inc. 2020
INSTALLATION INSTRUCTIONS
OVATION
®
BATH AND SHOWER
WALL SETS
MODELS: 2968BWT60, 2968SWT60
SAVE FOR FUTURE USE
NOTE: Remove protective plastic coating material from surface of panel before installation.
Take extra care in handling the front surfaces of the walls. Use only non-abrasive cloths to avoid scratching.
Thank you for selecting American Standard - the benchmark of fine quality for over 140 years. To ensure this product is installed
properly, please read these instructions carefully before you begin. (Certain installations may require professional help.)
REQUIRED TOOLS AND MATERIALS
BEFORE YOU BEGIN....
Local building codes vary by location. Observe all local plumbing and building codes.
Unpack your new walls and inspect them carefully for damage. Verify that the walls are the correct size for your installation.
Refer to American Standard roughing-in information for specific dimensions for each model.
Tape Measure
Caulking Gun
Hole Saw or Jig Saw
with fine tooth blade
Pencil
Drill
Square
Level
TOOLS:
Waterproof Adhesive
Tub & Tile Sealant
Mineral Spirits
Safety Glasses
Masking Tape
MATERIALS:
Visit www.americanstandard.com for coordinating products.
PREPARATION: Must be installed over SHEETROCK/GREENBOARD.
A) WALL SURFACE PREPARATION
NOTE: For best adhesion, we suggest priming walls prior
to installation.
Ensure wall surface is dry, smooth, and free of dust, soap
scum, mold or other contaminants. Wipe wall surfaces with
a damp cloth and allow to dry.
Wall surface must be dry before panels can be applied.
Ensure that alcove is plumb and square. See Illustration 1.
B) ROUGH PLUMBING & FITTINGS MUST BE INSTALLED
BEFORE WALLS
Turn off hot & cold water supplies.
Remove faucet handles, escutcheons, filler spouts and any
other fixtures & fittings (e.g. towel bars, soap dishes, etc.).
C) IF YOU PLAN TO INSTALL A SHOWER DOOR
Follow manufacturer’s instructions and prepare stud wall
accordingly.
Illustration 1
EACH ALCOVE STUD MUST
BE PLUMB AND SQUARE.

Summary of content (12 pages)