Installation Guide
- 3 -
4
M965801 Rev.1.1 (7/17)
CHECK
CONNECTIONS
FOR LEAKS
1
REMOVE
2
3
• Move HANDLE (1) into “off” position.
• Turn on water supplies and check connections for leaks.
• With HANDLE (1) in “off” position, unthread SPRAY (3)
from HOSE (2).
• Operate HANDLE (2) up and down, left and right to ush
water lines thoroughly.
• Replace SPRAY (3) onto HOSE (2).
• Operate HAND SPRAY and check connections for leaks.
TEST INSTALLED FAUCET & CHECK CONNECTION FOR LEAKS
5
STREAM (AERATOR)
SPRAY
5
3
4
SPRAY OPERATION
• With FAUCET on, press TOGGLE BUTTON (4) on SPRAY (3) to switch
from stream to spray.
• Press and hold PAUSE BUTTON (5) to temporarily stop ow from SPRAY
(3). Release PAUSE BUTTON (5) to resume ow from SPRAY (3).