Specification Sheet

L4
Revised (5/16)
© 2016 AS America Inc.
Roughing-in Dimensions
Left or Right Hand Installation
*Note: The Critical Line (-C-L-) on Vacuum Breaker
must typically be a minimum of 6
" (152mm) above
fixture. Consult Codes for details.
FOR 1-1/2" TOP
SPUD FIXTURES
-C-L-
*CRITICAL
LEVEL
SUPPLY
DN 25mm
(1" I.P.S.)
108mm-133mm
(4-1/4" to 5-1/4")
295mm
(11-1/2")
6047.121
ROUGH-IN
DIMENSION
687mm
(27")
6047.122
ROUGH-IN
DIMENSION
FINISHED WALL
6047.122
735mm
(29")
6047.121
343mm
(13-1/2")
38mm-127mm
(1-1/2"-5")
MANUAL FloWise
®
EXPOSED TOILET FLUSH VALVE
1.1 GPF
MEETS THE AMERICANS WITH DISABILITIES ACT GUIDELINES
AND ANSI A117.1 REQUIREMENTS FOR ACCESSIBLE AND
USABLE BUILDING FACILITIES-CHECK LOCAL CODES