Installation Sheet

4
M965022 Rev. 2.2 (5/19)
1
INSTALL SWEAT SOLDER ADAPTER; Fig. 3
Note: Install Optional Sweat Solder Adapter (Supplied)
for copper pipe supply line. Fig. 3.
1. Measure the distance (A) from the nished wall to the
center of the inlet spud on the xture.
2. Cut the supply pipe 1-1/4" (A-B=C) shorter then the
measurement taken in Step 1. File any rough edges off the
end of the supply pipe.
3. Clean the end of the supply pipe. Push the threaded
Adapter on until it is seated against the internal stop.
Sweat the Adapter to the pipe.
2
INSTALL COVER TUBE, WALL
ESCUTCHEON and SUPPLY STOP; Fig. 4
1. Measure from nished wall to rst thread of Adapter or
threaded supply pipe (dimension “X”). Cut COVER
TUBE (1) to length (X). Apply Teon Tape to the threaded
end of the Adapter or supply pipe. Fig. 4a.
2. Push the COVER TUBE (1) into the WALL
ESCUTCHEON (2). Slide both onto the SUPPLY PIPE (3).
Fig. 4b.
3. Push the COVER TUBE (1) in to expose the threads of the
supply pipe. Fig. 4c. With a wrench thread the SUPPLY
STOP (4) onto the SUPPLY PIPE (3). Align and tighten.
Fig. 4c.
4. Pull COVER TUBE (1) against SUPPLY STOP (4) and push
WALL ESCUTCHEON (2) against nished wall.
3
INSTALL DOWN TUBE AND
VACUUM BREAKER; Fig. 5
1. Place the SPUD FLANGE (1) over the spud on the Fixture.
2. Thread SPUD COUPLING NUT (2) onto Spud. Make sure
SEAL WASHER (3) and FRICTION WASHER (4) are
installed. Do not tighten fully.
3. Insert the DOWN TUBE (5) into the SPUD COUPLING
NUT (2) and push it down.
Note: If cutting Down Tube (5) to size, note that Critical
Line (C/L) on Vacuum Breaker must typically be 6"
(152mm) minimum above xture. Consult Code for
details.
CENTER LINE OF
FIXTURE SPUD
FINISHED WALL
FILE EDGES
SOLDER
ADAPTER
Fig.3
Fig.3a
ADAPTER
32mm
(1-1/4)
A
(A-B)=
B
C
CLEAN
1
1
4
2
3
Fig. 4
TEFLON TAPE
FINISHED WALL
X
X
Fig. 4a
Fig. 4b
Fig. 4c
2
1
2
3
4
5
Fig. 5
1-1/2" TOP SPUD
CAUTION
Turn off hot and cold water
supplies before beginning.