Installation Sheet

6
M965874 Rev. 1.1 (1/19)
6
ADJUST SUPPLY STOP; Fig. 13
IMPORTANT: To avoid overowing, the SUPPLY STOP (3)
must never be opened to the point where the ow from
the valve exceeds the ow capacity of the xture. Valve
is designed to provide stated ush volume with a 25 gpm
ow rate for toilet and 10 gpm ow rate for urinal.
1. Remove COVER (2) from SUPPLY STOP (3).Turn on water
supply 1/4 turn to 1/2 turn(CCW) and test for leaks.
Note: Unit may ush for approximately 5 to 10 sec. when
water is rst turned on.
2. Push down on HANDLE (4) to initiate ush.
3. Adjust SUPPLY STOP (3) after each ush until the stated
ush volume is achieved, no splashing occurs and the xture
is properly cleansed.
4. When adjustment is complete, reinstall COVER (2) and
tighten to ensure vandal-resistance.
7
HOW TO RETROFIT OUR VALVE; Fig. 14
Replaces Industry Standard Manual and Electronic Valves)
Note: In most Retrots the wall escutcheon, supply
stop, cover tube and vacuum breaker do not have to be
replaced. If these items do need replacement they must
be purchased separately or order the complete ush valve
assembly from American Standard.
1. Remove COVER (1) from SUPPLY STOP (2) if installed.
Fig. 14.
2. Turn water supply off. Fig. 14.
3. Unthread COUPLING NUT (3) and VACUUM BREAKER
COUPLING NUT (4). Remove FLUSH VALVE (5). Fig. 4a.
4. Clean all threaded connections before installing the new
ush valve. Fig. 14a.
5. Refer to Sections 4, 5 and 6 to complete the retrot installation.
Fig. 14b.
8
LEFT OR RIGHT HAND INSTALLATION;
Fig. 15
1. The FLUSH VALVE can be installed either as a right or left
hand installation.
2. Orientate the FLUSH VALVE as shown in Fig. 13 to desired
position for a left or right hand installation.
Fig. 13
2
REMOVE COVER
CLOCKWISE CLOSES
CONTROL STOP
COUNTER-CLOCKWISE
OPENS CONTROL STOP
3
CLEAN
CONNECTIONS
2
Fig. 14 Fig. 14a Fig. 14b
1
3
4
5
Fig. 15
Right or Left Hand Installation
Left Hand Right Hand