Installation Sheet

3
M965874 Rev. 1.1 (1/19)
1
2
3
4
5
6
7
8
10'
1. Flush Valve Assembly
2. Vacuum Breaker Assembly for Toilet
2a. Vacuum Breaker Assembly for Urinal
3. Spud Coupling Nut and Washers for Toilet
3a. Spud Coupling Nut and Washers for Urinal
4. Spud Flange for Toilet
4a. Spud Flange for Urinal
5. Sweat Solder Adapter
6. Cover Tube
7. Wall Escutcheon
8. Supply Stop
9. Installation Instruction
*Note: The Critical Line (-C-L-) on Vacuum Breaker
must typically be 6
" (152mm) minimum above fixture.
Consult Codes for details.
FOR 1-1/2" TOP
SPUD FIXTURES
-C-L-
*CRITICAL
LEVEL
SUPPLY
DN 25 mm
(1" I.P.S.)
108-133 mm
(4-1/4" to 5-1/4")
292 mm
(11-1/2")
6047.1x1
ROUGH-IN
DIMENSION
686 mm
(27")
6047.1x2
ROUGH-IN
DIMENSION
610 mm
(24")
6047.117
ROUGH-IN
DIMENSION
FINISHED WALL
6047.1x2
765 mm
(30-1/8")
6047.117
689 mm
(27-1/8")
6047.1x1
371 mm
(14-5/8")
38mm-127mm
(1-1/2-5")
Right or Left Hand Installation
152 mm
(6")
(Min.)
Roughing-in Dimensions
Fig.1
Fig.2
FINISHED WALL
FINISHED
FLOOR
57 mm Min.
(2-1/4")
371 mm
(14-5/8")
TYPICAL WATER CLOSET INSTALLATION:
AFWALL
TOILET SHOWN
295 mm
(11-1/2")
-C-L-
SEE ROUGH-IN
ABOVE
CRITICAL
LEVEL
108 mm, +/-13 mm
(4-3/4")(+/-1/2")
SUPPLY
DN 25 mm
(1" I.P.S.)
*Note: The Critical Line (-C-L-) on Vacuum Breaker
must typically be 6
" (152mm) minimum above fixture.
Consult Codes for details.
Right or Left Hand Installation
-C-L-
152mm
(6)
(Min.)
*CRITICAL
LEVEL
SUPPLY
DN 19mm
(3/4" I.P.S.)
295mm
(11-1/2")
FINISHED WALL
371mm
(14-5/8")
38mm-127mm
(1-1/2-5")
-C-L-
FOR 3/4" TOP
SPUD URINAL
108-133 mm
(4-1/4" to 5-1/4")
FINISHED FLOOR
FINISHED WALL
371 mm
(14-5/8")
TYPICAL URINAL INSTALLATION: WASHBROOK URINAL SHOWN
295 mm
(11-1/2")
SEE ROUGH-IN
ABOVE
CRITICAL
LEVEL
-C-L-
SUPPLY
DN 20 mm
(3/4" I.P.S.)
108-133 mm
(4-1/4" to 5-1/4")
-C-L-
57 mm Min.
(2-1/4")
Roughing-in Dimensions
Fig.2
RECOMMENDED TOOLS; Fig. 2
1. Teon Tape
2. Flat Blade Screwdriver (For adjusting Supply Stop)
3. Adjustable Wrench
4. Tape Measure
5. Hacksaw
6. Tubing Cutter
7. File