Installation Guide

- 1 -
Product names listed herein are trademarks of AS America, Inc.
© AS America, Inc. 2017
Thank you for selecting American Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly-please read
these instructions carefully before you begin.
M965820 (8/17)
PATIENCE
DECK MOUNT BATH FILLER
INSTALLATION
INSTRUCTIONS
7106.9X1
Flat Blade Screwdriver
Adjustable Wrench
*Hex key
*Supplied with tting
*Wrench
Certied to comply with ANSI A112.18.1M
*Supplied with Fittings
RECOMMENDED TOOLS ROUGHING-IN DIMENSIONS
NOTE: VALVE inlets are 3/4-inch NPT male.
4
2
3
1
3
4
ADJ. 6-1/2 TO 12
5
MOUNTING
SURFACE
5
6
7
MOUNTING
SURFACE
SPOUT
ASSEMBLY
SPOUT RECESS
1
3
2
4
1
SPOUT ASSEMBLY
CAUTION
Turn off hot and cold water
supplies before begining.
Install RING WASHER (1) and NUT (7) into spout
base recess. Insert SPOUT SHANK (3) through
center hole on mounting surface.
Assemble RUBBER WASHER (4) and BRASS
WASHER (5) and LOCKNUT (6) onto SPOUT
SHANK (3). Align SPOUT ASSEMBLY and from
underside of ledge secure SPOUT ASSEMBLY
into position with LOCKNUT (6).
2
PREPARE TUBE AND TEE ASSEMBLY
MOUNTING
SURFACE
8" (203 mm)
14" (349 mm)
6-1/2"
(170 mm)
1-1/2
" (38 mm)
MAX.
1-1/4
"
(32 mm)
MAX.
1-3/16
"
(30 mm)
DIA.
3
"
(76 mm)
(H)
(C)
1-1/8
"
(28 mm)
DIA.
8
"
(205 mm)
8-1/2"
(216 mm)
12
" (304 mm)
MAX
1-1/16
"
(27 mm)
DIA.
3/4-14 MALE
N.P.T. INLETS
6-1/2"
(170 mm)
9"
(229 mm)
1-15/16"
(49 mm)
DIA.
3-13/16"
(97 mm)
2-1/2"
(64 mm)
DIA.
3-7/8"
(98 mm)
Channel Locks
Prepare TUBE and TEE ASSEMBLY (1) to t center to center
VALVE (2) location . If necessary, cut and/or bend TUBING carefully.
Make sure tube bend is close to the TEE (1) so that it will not effect
the compression joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).

Summary of content (4 pages)