Specification

*Wrench
Certified to comply with ANSI A112.18.1
Recommended Tools
*Supplied with Fitting
*Hex key
SPOUT RECESS
Turn off hot and cold water
supplies before beginning.
CAUTION
1
2
Assemble RUBBER WASHER (4) and BRASS WASHER (5) and
LOCKNUT (6) onto SPOUT SHANK (3). Align SPOUT ASSEMBLY
and from underside of ledge secure SPOUT ASSEMBLY into
position with LOCKNUT (6).
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
4
2
3
1
3
4
1
2
4
5
Prepare TUBE and TEE ASSEMBLY (1) to fit each VALVE (2).
Distance between valves should be between 10-1/2" and 12"
(center to center). If necessary, cut and/or bend TUBING
carefully. Make sure tube bend is close to the TEE (1) so
that it will not effect the compression joint at the
VALVE CONNECTION.
ADJ. 10-1/2 TO 12
6
5
Flat Blade Screwdriver
Adjustable Wrench
Slip Jaw Pliers
MOUNTING
SURFACE
VALVE inlets are 3/4-inch NPT male.
NOTE
ROUGHING-IN DIMENSIONS
MOUNTING
SURFACE
DECK-MOUNT BATH FILLER
Installation
Instructions
7186.900
7186.901
Install RING WASHER (1) into SPOUT recess. Check that O-RING (2)
on end of SPOUT SHANK (3) is in place. Insert SPOUT SHANK (3)
through center hole on mounting surface.
FLUENT™
3
M965623
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
MOUNTING
SURFACE
165mm to 305mm
(ADJ. 6-1/2 TO 12)
38mm
(1-1/2" MAX.)
32mm
(1-1/4
"
MAX.)
31mm
(1-3/16
"
DIA.)
76mm
(3
")
40mm
(1-5/8
")
DIA.
(H)
(C)
29mm
(1-1/8
"
DIA.)
208mm
(8-3/16
")
305mm
(12
"
MAX)
53mm
(2-1/16
")
27mm
(1-1/16
"
DIA.)
3/4-14 MALE
N.P.T. INLETS
93mm
(3-5/8")
140mm
(5-3/8")
219mm
(8-5/8")
250mm
(9-3/4")
199mm
(7-7/8")
SPOUT
ASSEMBLY
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.

Summary of content (4 pages)