Installation Guide

4
710352-100 Rev. B 7/16
INSTALLATION NOTES:
This unit is recommended to be installed by two people. Two people are required for sections 2 and 3.
Cover drain with tape prior to installation to prevent the loss of small parts.
Unpack your unit carefully and inspect for freight damage. Lay out and identify all parts using box contents page as a
reference. Before discarding the carton check to see that no small hardware parts have fallen to the bottom of the box. If
any parts are damaged or missing refer to the description noted on the replacement parts page when inquiring about
replacements.
Handle the glass panels carefully and protect the edges. Although tempered glass is very resistant to breakage, the glass
can still break if unequal pressure is applied during installation and the sharp corners of the panel can damage tile and
ooring surface.
Be sure to wear safety glasses whenever drilling or cutting. When drilling holes in ceramic tile or marble use a center
punch and hammer to carefully break the glazed surface. This will prevent skidding when drilling.
NOTE: TEMPERED GLASS CANNOT BE DRILLED, CUT OR MODIFIED.
1
ATTACHING WALL POSTS
2
4
3
2
3/4"
(19 mm)
1
1. With the shower base and walls installed, use a level to mark vertical lines at the outside edge of the shower base as shown.
2. Position a Wall Post [4] 3/4" from the drawn line. Ensure that it is plumb and mark the location of the mounting holes on the wall.
3. Remove the post. Using an 1/8" drill bit, drill holes where marked on the wall.
4. Replace the wall post and ensure that the holes on the side of the wall post face the inside of the shower enclosure.
Fasten the wall post to the wall using the M4 x 35 Flat Screws [2].
Note: If not using the Axis Shower Wall (Model 3838CW), then wall anchors [1] must be used.
5. Repeat above steps for the second wall post.