Installation Guide

6
710352-100 Rev. B 7/16
3
4
INSTALLING THE HANDLE SET, MAGNETIC GASKETS, AND SIDE GASKETS
3
1
2
1
2
3
3A
3
3
1A
1B
!
NOTE: TWO PEOPLE REQUIRED FOR THIS STEP!
1. Place the completed frame on the shower base and insert the ends into the wall posts. Be sure that the frame is centered
on the shower base and the frame is fully inserted into the Wall Posts. In Section 5, adjustments to the frame can be made by
decreasing the insertion amount prior to attaching the frame to the wall posts permanently.
2. Install a Curved Door Panel [10] in the frame by placing the Top Rollers [13] in the Top Rail. This will allow the frame
to support the Door Panel for the next step.
3. Pull the Bottom Rollers [9] down and insert them into the Bottom Rail.
4. Repeat steps 2 and 3 for the second door.
5. Apply lube to the Top and Bottom Rollers on each door.
1. Install the Handle Sets [11] on the Door Panels as shown.
2. Install the Magnetic Gaskets [12] on the Door Panels as shown. The two gaskets form a 180° angle when the doors meet in the
closed position.
3. Install the Side Gaskets [15] on the sides of the Fixed Panels and Door Panels as shown.
Be sure that the flange on the gaskets face the other panel at a 90° angle and that the longer flanges are
to the inside of the shower.
180˚ ANGLE
3B
FITTING FRAME ASSEMBLY INTO OPENING AND INSTALLING THE SLIDING DOOR PANELS