FIXING THE FRAME TO THE WALL POSTS
INSTALLING PROFILE COVERS AND APPLYING SILICONE
2A
1
2B
Allow 24 hours for
silicone to dry
before use.
Note: Ensure that the wall profiles are plumb. Adjust the enclosure to be square and level. The frame should be adjusted
to be centered between the wall posts and ensure the door opens smoothly. The frame is adjusted by increasing or
decreasing the overlap between frame and wall post on each side.
1. Slide eight Inserts [20] onto the Wall Posts as shown.
2. A. Using a 1/8" drill bit, drill holes in the frame posts using the holes in the Wall Posts as location guides.
B. Slide the Inserts over the holes and secure the Wall Posts to the frame post using the M4 x 10 screws [3].
1. Install the Side Profile Covers [19] on the Wall Posts by snapping them over the Wall Posts as shown.
2. Install the Wall Jamb Caps [21] on the top of the Wall Posts
3. Apply silicone between Wall Posts and Wall and Bottom Rail and Shower Base.
Note: Allow 24 hours for the silicone to dry before use.