Instructions / Assembly

STUD LAYOUT FOR WALL INSTALLATION FOR USE WITH 2603/2699 SHOWER BASE (SHOWN).
The studs should be located as shown to properly support walls. Provide additional studs where illustrated. (below)
NOTE: INSTALLATION
OVER GREENBOARD OR
FIREWALLS:
If installing wall panels over
greenboard and/or firewall
material and not directly on
the studs, your alcove
dimensions must consider
the thickness of this material.
Measure from the inside of
the finished walls.
754964-100 Rev. A
Product names listed herein are trademarks of AS America Inc.
© AS America Inc. 2013
NOTE: Take extra care in handling the front surfaces of the walls. Use only non-abrasive cloths to avoid scratching.
Thank you for selecting American Standard – the benchmark of fine quality for over 100 years. To ensure this product is installed properly, please read
these instructions carefully before you begin. (Certain installations may require professional help.) Also be sure your installation conforms to local codes.
INSTALLATION INSTRUCTIONS
2603 & 2699 Series Wall Surrounds
Visit www.americanstandard.com for coordinating products.
USE WITH 2602 OR 2698 SERIES SHOWER BASES
REQUIRED TOOLS AND MATERIALS
BEFORE YOU BEGIN....
Local building codes vary by location. Observe all local plumbing and building codes.
Unpack your new shower walls and inspect them carefully for damage. Verify that the walls are the correct size for your installation.
Refer to American Standard roughing-in information for specific dimensions for each model.
Caulking Gun
Level
Square
Utility Knife
Pencil
Drill
Hole Saw or
Sabre Saw
Tape Measure
TOOLS:
Acrylic/Latex or Acrylic/Silicone Sealant
Galvanized (or corrosion resistant) flat head screws 3/4" minimum length
2 x 4 lumber for additional wall studs as required
Tub Surround Adhesive
1 x 4’s if installing shower doors
MATERIALS:
PREPARATION:
The 2603/2699 Series Wall Surrounds are to be installed directly
over stud walls. Drywall is not required.
A) Remove dry wall surface and ensure that alcove is plumb and square.
(Illustration 1)
B) Prepare studs as indicated below.
IMPORTANT:
C) Rough plumbing and fittings must be installed before walls.
Illustration 1
SAVE FOR FUTURE USE
Each alcove
stud must be
plumb and
square.
The 2699 Series Wall Surrounds are to
be installed directly over stud walls.
Drywall is not required.
LHO shown
(RHO opposite)
8-1/4"
(210mm)
8-1/4"
(210mm)
30"
(762mm)
5-3/4"
(146mm)
5-3/4"
(146mm)
12"
(305mm)
60"
(1524mm)
9-1/4"
(235mm)
9-1/4"
(235mm)
10"
(254mm)
10"
(254mm)
34"
(864mm)
The 2603 Series Wall Surrounds are to
be installed directly over stud walls.
Drywall is not required.
8-1/4"
(210mm)
8-1/4"
(210mm)
30"
(762mm)
12"
(305mm)
48"
(1219mm)
9-1/4"
(235mm)
9-1/4"
(235mm)
8"
(203mm)
8"
(203mm)
33-1/2"
(851mm)