Deck-Mount Bath Filler Installation Instructions

SPOUT BASE
RECESS
Turn off hot and cold water
supplies before beginning.
CAUTION
1
2
Assemble RUBBER WASHER (5) and LOCKNUT (6) onto SPOUT
SHANK (1). Align SPOUT ASSEMBLY and from underside of ledge
secure SPOUT ASSEMBLY into position with LOCKNUT (6).
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
3
1
4
5
6
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and 12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
2
2
4
3
1
3
4
5
MOUNTING
SURFACE
SPOUT
ASSEMBLY
VALVE inlet is 3/4-inch NPT male.
NOTE
Install RING WASHER (1) into SPOUT BASE recess. Check
that O-RING (2) on end of SPOUT SHANK (3) is in place. Insert
SPOUT SHANK (3) through SPOUT ESCUTCHEON (4) and
into center hole on mounting surface.
2
ADJ. 6-1/2 TO 12
MOUNTING
SURFACE
M968288 Rev. 1.1
3
Push TUBING (3) ends into VALVE (4) side outlets. Insert VALVES (4)
into mounting holes from underside of ledge.
Press TEE (5) onto SPOUT SHANK (6) making certain that the O-RING (7) is
properly seated on SHANK (6). Push COUPLING (8 or 8a) into TEE (5) and
attach to SPOUT SHANK (6) and tighten. Note: For product with Hand
Shower, COUPLING (8) is tightened using a 10mm (3/8”)
Hex Wrench.
Install LOCKNUTS (1) and RUBBER WASHERS (2) onto valve shanks.
Place RUBBER RING (10) into ESCUTCHEON ADAPTERS (9) and thread onto
valves until snug against internal stop.
Tighten LOCKNUT (1) to secure VALVE (4) position.
Slide FERRULE (12) and COUPLING NUT (13) to outlet of VALVE (4) and tighten
COUPLING NUT (13) firmly.
Connect HOT water supply to inlet of
left VALVE and COLD water supply to
inlet of right VALVE using appropriate
connector.
VALVE ASSEMBLY
Thread of VALVE BODY (4) should extend at least 5/16 inch above
MOUNTING SURFACE (11). If necessary, adjust LOCKNUT (1).
FOR FITTING
LESS SPRAY
11
10
HOT
COLD
12
4
13
7
6
88a
5
13
12
3
4
MOUNTING
SURFACE
10
9
9
9
2
4
5/16'' MIN.
MOUNTING
SURFACE
10
11
1