Green Tea Deck-Mount Bath Filler Specification Sheet

*Wrench
Certified to comply with ANSI A112.18.1M
Recommended Tools
*Supplied with Fitting
*Hex key
SPOUT RECESS
Turn off hot and cold water
supplies before beginning.
CAUTION
1
2
Assemble RUBBER WASHER (4) and BRASS WASHER (5) and
LOCKNUT (6) onto SPOUT SHANK (3). Align SPOUT ASSEMBLY
and from underside of ledge secure SPOUT ASSEMBLY into
position with LOCKNUT (6).
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
4
2
3
1
3
4
1
2
4
5
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and 12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
ADJ. 6-1/2 TO 12
6
5
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
MOUNTING
SURFACE
VALVE inlet is 3/4-inch NPT male.
NOTE
MOUNTING
SURFACE
ADJ. 6-1/2 TO 12
ROUGHING-IN DIMENSIONS
MOUNTING
SURFACE
8-1/16"
DECK-MOUNT BATH FILLER
Installation
Instructions
7010.900
7010.901
1-1/2 MAX.
1-1/4
MAX.
1-3/16 DIA.
3
(H)
(C)
1-1/8 DIA.
12 MAX
2-1/16
DIA.
1-1/16 DIA.
3/4-14 MALE
N.P.T. INLETS
Install RING WASHER (1) into SPOUT recess. Check that O-RING (2)
on end of SPOUT SHANK (3) is in place. Insert SPOUT SHANK (3)
through center hole on mounting surface.
GREEN TEA
5-5/16"
3"
3-3/4"
10-5/8"
2-1/16"
DIA.
2-1/8"
3
M968595 Rev.1.2
2-9/16"
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
SPOUT
ASSEMBLY
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
7-7/8"
(200mm)

Summary of content (4 pages)