bl IA INSTALLATION INSTRUCTIONS FOR THE . MODEL 830-AA SERVICE SINK WITH INTEGRAL VACUUM BREAKER (2) CLEARANCE HOLES FORGE LP.S. SUPPLIES NOT LESS THAN 1 DiA, o BRACE FMNGE~1\\ MALE THREADS ’ /8" ECCENTRIC s 44" HOSE THREAD HOT ™. _"clop . INTEGRATE_ STOPS. Fig. 3 VACUUM BREAKER Fig. 1 Fig. 2 INSTALLATION INSTRUCTIONS . Unpack the valve and check for any damage that may have occurred during shipment. Drill the supply holes for the hot and cold sides of the valve as per Fig.