Installation Guide

- 4 -
M965925 (5/18)
• Complete the installation of the Finished Floor. Tile as close to the PLASTER GUARD (3) as you can.
• Caulk between Finished Floor and PLASTER GUARD (3).
FINISH FLOOR INSTALLATION
5
HOT
COLD
FRONT
FINISHED FLOOR
ROUGH FLOOR
3