Installation Guide

- 3 -
M965907 Rev. 1.2 (8/19)
THIN WALL INSTALL
2
CAUTION
Turn off hot and cold water
supplies before beginning.
n See Roughing-in diagram before starting.
n Finished wall should allow for a 3-1/2" diameter opening (Use PLASTER GUARD for guidance).
n Remove PLASTER GUARD (8), rotate 90˚ counter clockwise and install the two screws. (Thin wall text should be on top)
n Use SELF-CENTERING HOLE GUIDES (9) as a guide for thin wall install.
n LOCKING SCREW (10) keeps valve in place when installing. Completely Thread LOCKING SCREW (10) onto
PLASTER GUARD (8).
n During the installation, make sure to position the Locking feature screw as shown in Figure A below. Once the valve is
positioned on the Thin Wall, turn counterclockwise as shown in Figure B to secure VALVE BODY (2) in place.
n Connect HOT and COLD water supplies per connection method of selected valve.
n Connect RISER PIPE (1) to VALVE BODY (2) top outlet marked “UP”.
n Connect TUB FILLER PIPE (3) to bottom outlet.
CAUTION: After valve installation, inspect the VALVE BODY for any debris. It can damage Pressure Balance
Valve cartridge.
NOTE: For back to back installation, follow steps mentioned above. Reversal of Hot/Cold water supplies is
accomplished by rotating cartridge (supplied with trim) 180° during installation.
COLD
1
2
3
HOT
10
6
3-1/2"
SIDE VIEW
8
9
Fig. B
Fig. A
UNLOCK
LOCK
10
10
Hex
Wrench
4 mm