Installation Guide

3/16" DRILLED
HOLE
5
TROPIC TRIM KIT
DECK MOUNT
TUB SYSTEMS
Installation
Instructions
T038.900
Certified to comply with ANSI A112.18.1
1
SPOUT INSTALLATION
U.S. Patent No. D403,750
FINISHED
DECK
REMOVE ALL
BURRS AND
BEVEL
TEMPLATE FOR
SPOUT ROLL
PIN LOCATION
3/16" DIA. HOLE
Drill with 3/16" bit
8.4mm
(21/64")
19.8mm
(23/32")
1"- 2"
FRONT
Complete FINISHED DECK before trim installation.
Turn off the water supplies.
Remove the GUARDS (1) from the VALVE BODIES (2). Remove the
GUARD (3) and 1/4" PLUG (4) from the SPOUT SHANK (5).
The SPOUT SHANK (5) height should be 1" to 2" above the FINISHED
DECK. Cut the SPOUT SHANK (5) if necessary. Remove all burrs
and bevel the end of the shank. Failure to do so may damage
the SPOUT O-ring during installation and cause water leakage.
Drill a 3/16" hole in the finished deckfor spout locking pin. See
TEMPLATE for location.
18.6mm DIA.
(47/64")
SPOUT SHANK
3
4
5
1
1
2
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Phillips Screwdriver
Recommended Tools
M968896 Rev. 1.2
Thank you for selecting American-Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.

Summary of content (4 pages)