Installation Sheet

- 1 -
Product names listed herein are trademarks of AS America, Inc.
© AS America, Inc. 2016
Thank you for selecting American Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly-please
read these instructions carefully before you begin.
RECOMMENDED TOOLS
M965759 (8/16)
COLONY
®
PRO
DECK MOUNT TUB FILLER
INSTALLATION
INSTRUCTIONS
T075.900
Certied to comply with ANSI A112.18.1M
U.S. Patent No. D403,750
Flat Blade Screwdriver Adjustable Wrench
Channel Locks
*Hex Key
*Supplied with Fittings
1
SPOUT INSTALLATION
CAUTION
Turn off hot and cold water
supplies before begining.
Complete FINISHED DECK (A) before trim installation.
Turn off the water supplies.
Remove the GUARDS (1) from the VALVE BODIES (2).
Remove the SPOUT GUARD (3) and 1/4" PLUG (4) from
the SPOUT SHANK (5).
The SPOUT SHANK (6) height should be 1" to 2" above the
FINISHE DECK (A). Cut the SPOUT SHANK (5) if necessary.
Remove all burrs and bevel the end of the shank.
Failure to do so may damage the SPOUT O-ring during
installation and cause water leakage.
Lubricate the SPOUT O-RING (6).
Remove the PLUG BUTTON (7) from the SPOUT (8).
Position the RUBBER RING (9) in the GROOVE (B) in the base of the SPOUT (8).
Push the SPOUT (8) down onto the SPOUT SHANK (5) in the FINISHED DECK (A).
Tighten the SET SCREW (10) securely with the 5mm HEX KEY (11).
Insert the PLUG BUTTON (7)
into the SPOUT (8).
REMOVE ALL
BURRS AND
BEVEL
1"- 2"
A
4
3
1
2
5
10
7
11
8
5
A
9
6
B

Summary of content (2 pages)