Installation Sheet

M965029 REV.1.2
2
INSTALL HANDLES
Should the hot and cold water supply pipes have been transposed making
adjustment impossible, proceed as follows:
TRANSPOSED SUPPLY PIPING
OR BACK TO BACK INSTALLATION
3
Remove check stops and re-install them transposed.
Shut off water supply.
Remove handle and rim. (Reverse steps 1 and 2.
CHECK STOP
(RED TO BLUE)
Turn the water supply back on and perform the temperature adjustment in step 4.
Assemble HANDLES and TRIM.
CHECK STOP
(BLUE TO RED)
Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE
CHECK STOP is now on the left.
10
7
Install HANDLE ADAPTER (1) onto HANDLE BASE (2) and tighten
with SCREW (3).
Align HANDLE (4) and push onto HANDLE ADAPTER (1).
Tighten SET SCREW (5) in handle with HEX WRENCH (6) SUPPLIED.
Install HANDLE ADAPTER (7) onto KNOB MOUNT (8).
Push VOLUME CONTROL KNOB (9) onto HANDLE ADAPTER (7).
Use HEX WRENCH (6) supplied and tighten SET SCREW (10) to secure
VOLUME CONTROL KNOB (9).
2
1
4
3
5
6
TOP
1
Remove PLASTER GUARD (1) if attached.
Push CAPS (2 & 2a) as shown onto CONTROL
VALVES (3).
Push ESCUTCHEON (4) with lightly greased
O-RING SEALS (5) over CAPS (2, 2a). Attach with the
two SCREWS (6) provided.
Align pins in back of DIAL PLATE (7) with holes in
ESCUTCHEON (4) and push DIAL PLATE (7) into place.
1
TRIM INSTALLATION
2
2a
6
3
1
4
7
5
8
9