Installation Instructions

Americana Building Products .
19
Sierra Patio Cover Installation Guide
STEP 10B - 3” BOX BEAM
Position header (S) over posts (C) with an equal
amount of overhang on both ends.
NOTE: If header (S) is in two or more pieces, be
sure one end of the header is centered over a post.
Complete splice installation below before attaching
to posts.
Attach header (S) to header mounting bracket (I)
using (4) #12 x 1-1/4” screws (BB).
10” ‘V’ style panel installation: Go to page 21
8” flat style panel installation: Go to page 23
OPTIONAL - 3” BOX BEAM SPLICE
If header (S) is in two or more pieces, insert an
equal amount of the provided splice into the ends of
the headers.
The header splice (if not sent pre-assembled) is (2)
post mounting brackets (H) attached using (4) 1/4” x
3/4” bolts (MM) and 1/4” square nuts (NN).
Attach the header splice to header (S) using (4) #8
x 3/4” screws (AA).
10B
10B
SPLICE ASSEMBLY