User's Manual

Page33of52
Ifmountingtoastructurewithrailslots,insert3/8or1/4inchhardwareintherailslotbeforemodulesor
“L” feet or stanchions are secured.EachSPT requires two bolts, two nuts, two flat washers, and two lock
washers.Whizznutsarenotrecommendedasthegalvanizedcoating
ofthebracketmaybecompromised.
Secureeachbracket,makingsurethateachlockwasherisfullycompressed.Torque3/8inchfastenersto
XXXinchpoundsand1/4inchfastenerstoYYYinchpounds.
Mountingintorailsorbraceswithoutslots
Checkwithrackingormodulesupportmanufacturerforsuggestedmountingprocedure.
Check with a local structural engineer and/or the racking manufacturer if any modifications to the
structure(ie.Drillingholes)
Usethebracketasaguideforanypredrilledholes.
Insert3/8or¼inchhardwareintherailslot.EachSPTrequirestwobolts,twonuts,twoflatwashers,and
two lock washers.Whizz nuts are not recommended as the galvanized coating of the bracket may be
compromised.
Secureeachbracket,makingsurethateachlockwasherisfullycompressed.Torque3/8inchfastenersto
XXXinchpoundsand¼inchfastenerstoYYYinchpounds.
HRDMountingandMechanical
Electricalconnectionsandcommunicationwithhandheld
Mountandgroundmodulepermodulemanufacturer’sinstructions.
ConnectthemoduleleadstotheSPT
InspectMCconnectorforwatertightseal
Establishcommunicationwiththehandheldunit.
PlaceSPTin“On”mode.