Specifications

TWO: INSTALLATION
INTRODUCTION
This section provides recommendations and procedures for inspecting, installing, and testing the power
supply.
BASIC SETUP PROCEDURE
To summarize the basic setup procedure and an overall view of the subsections. Use the procedure as a quick
reference if you are familiar with the installation requirements for the power supply. If you want more
information, each step in the procedure refers to subsequent sections, which contain more details. Execute
each step in the sequence provided.
BASIC SETUP PROCEDURE
------------------------------------------------------------------------------------------------------------------------------------
Step# Description Action Reference
------------------------------------------------------------------------------------------------------------------------------------
1 Inspection Perform an initial physical Inspection, cleaning,
inspection of the supply. and packaging.
------------------------------------------------------------------------------------------------------------------------------------
2 Installation Install the instrument on Location, mounting,
bench or rack mount, and ventilation.
ensuring adequate ventilation.
------------------------------------------------------------------------------------------------------------------------------------
3 Input power Connect AC input power AC input power
connection.
------------------------------------------------------------------------------------------------------------------------------------
4 Test Perform functional tests for Functional test.
CV mode, CC mode, and
front panel controls.
------------------------------------------------------------------------------------------------------------------------------------
5 Load Connect the load. Load connection.
------------------------------------------------------------------------------------------------------------------------------------
6 Sense Connect sensing lines. Local and Remote
sense.
------------------------------------------------------------------------------------------------------------------------------------
* See Local Operation for instructions for front panel operation, OVP