Specifications

Installation
Installation
1. Find a suitable location for the NXB-CCG-K.
2. Mount vertically (FIG. 3) or horizontally (FIG. 4), using two #6 (M3) screws (FIG. 5). When mounting, allow 7 in
(177.8 mm) clearance for the antenna and ensure convenient access to the power plug. In order to achieve proper RF
performance, do not mount unit in a metal enclosure.
3. Attach the DC adapter cord to the power jack on the NXB-CCG-K and insert the DC adapter plug into a receptacle
(FIG. 2).
FIG. 3 NXB-CCG-K - Vertical Installation
FIG. 4 NXB-CCG-K - Horizontal Installation
1”
(25.4 mm)
Wall
Level Surface
1”
(25.4 mm)