Installation Guide

INSTALLATION:
12
Step 7: Connect Wiring
Position the power pack below the installed custom hood. Insert
the house wiring cable through the wire clamp previously
installed in step 7. Tighten the wire clamp to secure the cable.
Using the provided wire connectors, connect power pack wires
to power cable into wiring box
Connect wires as follow: BLACK to BLACK, WHITE to WHITE
and GREEN or bare wire under ground screw. DO NOT FORGET
TO CONNECT THE GROUND. Reinstall wiring cover.
Step 8: Remove blower
In order to ease the power pack alignment with existing ductwork,
unplug and disassemble the blower from the power pack before
installing the custom hood.
Unplug the blower(s)
Using a 5/16" socket, remove all blower mounting screws from
the inner top of the power pack. Set the screws aside.
Slide the blower to disengage its flange from the retaining bracket. Set the blower aside.
Step 9: Install Power Pack
Using provided no. 8 x 1/2" chrome plated screws, install the
power pack inside the custom hood. Start with 2 screws on the
front corners, then use 4 screws for sides and use the remaining
ones to finalioze securing the front power pack. (See figure at
right for mounting screw specific locations.)
Make sure the adpator/damper (or the adapter) enters the
ducting. When there is access to the top of the power pack, seal
connections with metal foil duct tape.
CAUTION: Take care not to kink
ducting when installing power pack
Fig#11
Fig#12
Fig#13
Fig#14
Fig#15
Fig#16