® ION -M7HP/85HP EU Extension Unit (ML-Cabinet) Manual MF0145ASA
DISCLAIMER: This document has been developed by CommScope, and is intended for the use of its customers and customer support personnel. The information in this document is subject to change without notice. While every effort has been made to eliminate errors, CommScope disclaims liability for any difficulties arising from the interpretation of the information contained herein.
Table of Contents TABLE OF CONTENTS 1. GENERAL 6 1.1. ABBREVIATIONS 6 1.2. HEALTH AND SAFETY 7 1.3. PROPERTY DAMAGE WARNINGS 7 1.4. COMPLIANCE 8 1.5. ABOUT COMMSCOPE 10 1.6. INTERNATIONAL CONTACT ADDRESSES FOR CUSTOMER SUPPORT 11 2. INTRODUCTION 13 2.1. PURPOSE 13 2.2. THE ION-M7HP/85HP EU 13 3. COMMISSIONING 15 3.1. 3.1.1. 3.1.2. 3.1.3. 3.1.4. 3.1.5. 3.1.6.
Table of Contents 5.3. CLEANING THE HEAT SINK 37 6. APPENDIX 38 6.1. ILLUSTRATIONS 38 6.2. 6.2.1. 6.2.2. 6.2.3. SPECIFICATIONS Electrical Specifications Mechanical Specifications Environmental and Safety Specifications 40 40 40 40 6.3. SPARE PARTS 41 7. INDEX Page 4 42 MF0145ASA.
Figures and Tables FIGURES AND TABLES figure 3-1 Maximum distance between RU and EU ................................................... 17 figure 3-2 Mounting bracket installation...................................................................... 18 figure 3-3 RU wall mounting ....................................................................................... 18 figure 3-4 Pole-mounting kit........................................................................................
1. General 1. General 1.1.
1. General 1.2. Health and Safety 1. Danger: Electrical hazard. Danger of death or fatal injury from electrical current. Obey all general and regional installation and safety regulations relating to work on high voltage installations, as well as regulations covering correct use of tools and personal protective equipment. 2. Danger: Electrical hazard. Danger of death or fatal injury from electrical current inside the unit in operation. Before opening the unit, disconnect mains power. 3.
1. General 7. Notice: Read and obey all the warning labels attached to the unit. Make sure that all warning labels are kept in a legible condition. Replace any missing or damaged labels. 8. Notice: Only license holders for the respective frequency range are allowed to operate this unit. 9. Notice: Make sure the repeater settings are correct for the intended use (refer to the manufacturer product information) and regulatory requirements are met.
1. General 3. Notice: Installation of this equipment is in full responsibility of the installer, who has also the responsibility, that cables and couplers are calculated into the maximum gain of the antennas, so that this value, which is filed in the FCC Grant and can be requested from the FCC data base, is not exceeded. The industrial boosters are shipped only as a naked booster without any installation devices or antennas as it needs for professional installation. 4.
1. General 1.5. About CommScope CommScope is the foremost supplier of one-stop, end-to-end radio frequency (RF) solutions. Part of the CommScope portfolio are complete solutions for wireless infrastructure from top-of-the-tower base station antennas to cable systems and cabinets, RF site solutions, signal distribution, and network optimization. For patents see www.cs-pat.com. CommScope has global engineering and manufacturing facilities.
1. General 1.6. International Contact Addresses for Customer Support Canada United States CommScope Canada Andrew LLC, A CommScope Company Mail 505 Consumers Road, Suite 803 Toronto M2J 4V8, Canada Mail 620 North Greenfield Parkway Garner, NC 27529, U.S.A. Phone +1-905-878-3457 (Office) +1-416-721-5058 (Cell) Phone +1-888-297-6433 Fax +1-905-878-3297 A Fax E-mail wisupport@commscope.com Caribbean & South American Region CommScope Cabos do Brasil Ltda.
1. General United Kingdom Scandinavia Andrew Wireless Systems UK Ltd Andrew Norway (AMNW) Mail Unit 15, Ilex Building Mulberry Business Park Fishponds Road Wokingham Berkshire RG41 2GY, England Mail P.O. Box 3066 Osloveien 10 Hoenefoss 3501 Norway Phone +44-1189-366-792 Phone + 47 32-12-3530 Fax +44-1189-366-773 Fax + 47 32-12-3531 E-mail wisupport.uk@commscope.com E-mail wisupport@commscope.
2. Introduction 2. Introduction 2.1. Purpose Cellular telephone systems transmit signals in two directions between a base transceiver station (BTS) and mobile stations (MS) within the signal coverage area. If weak signal transmissions occur within the coverage area because of indoor applications, topological conditions or distance from the transmitter, extension of the transmission range can be achieved by means of an optical distribution system.
2. Introduction The ION is easily set-up and supervised via a graphical user interface (GUI). Remote units can be commissioned through the use of built-in test equipment. An autoleveling function compensates for the optical link loss making installation easy and quick. The entire system may be monitored remotely via an Andrew OMC. This platform uses SNMP protocol and is compliant to X.733 standard.
3. Commissioning 3. Commissioning Read and observe the health, safety, and property damage warnings as well as the description carefully to avoid mistakes and proceed step-by-step as described. Attention: Do not operate the unit without terminating the antenna connectors. The antenna connectors may be terminated by connecting them to their respective antennas or to a dummy load.
3. Commissioning 6. Notice: A spacing of 40 mm (1.58 inch) around the unit is required. 7. Notice: To ensure sufficient airflow when mounting the unit in enclosed spaces, two lid openings (one for the air inlet and the other for the air outlet) must be provided. Do not block these air inlets and outlets when mounting the unit. The size of each opening must equal at least 18 x 18 cm (>300 cm2). Make sure, too, there is no thermal short circuit between the air inlet and air outlet. 8.
3. Commissioning 3.1.3. Mounting Distance between RU and EU The Extension Unit has to be connected to the Remote Unit via the cable bridge that has to be ordered separately from the supplier. The length of the cable bridge determines the maximum mounting distance between the Remote Unit and the Extension Unit: Length 1200 mm 2000 mm 2500 mm Distance 585 mm / 23.03” 1385 mm / 54.52” 1885 mm / 74.21” Max. Distance R2 18 min .
3. Commissioning 3.1.4. Wall-Mounting Procedure Check the suitability of the wall-mounting kit and the wall. Mark the position of the drilling holes (for measurements and a more detailed description refer to the wall mounting plan that is part of the delivery). Drill four holes at the marked positions and insert dowels*. Screw the mounting brackets to the wall / dowels using the four dowel screws as illustrated in figure 3-2 Mounting bracket installation.
3. Commissioning 3.1.5. Pole Mounting The following mounting hardware is required for pole mounting: Wall/Pole mounting brackets Screw bands (stainless steel) M8.0x25 hexagon head screws Plain washers for M8.0 Split-lock washers figure 3-4 Pole-mounting kit Note: Use the 3 screw bands with clamps to fasten the two mounting brackets to the pole. Use 2 screw bands fitting next to each other on the upper side and 1 screw band on the lower side.
3. Commissioning Wall-/ Pole mounting bracket Wall-/ Pole mounting bracket Screw bands Screw bands Split-lock washer for M8.0 G3219M001 M8.0x25 hexagon head-screw Plain washer for M8.0 figure 3-5 Pole-mounting, ML-cabinet, assembly drawing Pole mounting finished (RU mounted to pole) L_G3219X000 figure 3-6 Pole mounting of RU, finished Page 20 MF0145ASA.
3. Commissioning 3.1.6. Mounting of DC Box The DC Box is pre-mounted on a mounting plate which has to be fastened to the lower mounting bracket of the RU after it has been mounted to a wall or pole as explained in the previous chapters. Fasten the mounting plate of the DC Box to the lower mounting bracket of the RU using the four pan head screws M4.0x8mm (observe torque of 3.
3. Commissioning 3.2. Electrical Installation 3.2.1. Health and Safety for Electrical Installation Read and observe observe chapter 1.2 Health and Safety. 1. Danger: Electrical hazard. Danger of death or fatal injury from electrical current. Obey all general and regional installation and safety regulations relating to work on high voltage installations, as well as regulations covering correct use of tools and personal protective equipment. 3.2.2. Property Damage Warnings for Electrical Installation 1.
3. Commissioning 10. Notice: For unstabilized electric networks, which frequently generate spikes, the use of a voltage limiting device is advised. 11. Notice: The unit complies with Overvoltage Category II.
3. Commissioning 3.2.4. Grounding (Earthing) Grounding must be carried out. Connect an earth-bonding cable to the grounding connection provided at the outside of the unit (see chapter 3.2.3 Connections). Do not use the grounding connection to connect external devices. figure 3-10 Grounding bolt figure 3-11 Grounding bolt, schematic view After loosening the hex nut, connect the earth-bonding cable between the two washers as illustrated in the figures above. Then, fasten all parts again with the hex nut.
3. Commissioning Attention: To minimize passive inter-modulation (PIM) distortion, attention has to be paid to the physical condition of the connector junctions: Do not use connectors that show signs of corrosion on the metal surface. Prevent the ingress of water or dirt into the connector. Use protective caps for the connectors when not mounted. Before mounting clean the connectors with dry compressed air.
3. Commissioning 4. Clean the connector winding with lintfree wipe drenched with isopropyl alcohol. 5. Clean the lip of the inner ring with lint-free wipe drenched with isopropyl alcohol. 6. Clean the inside surface of the inner ring with lint-free wipe drenched with isopropyl alcohol. 7. Clean the inside of the center conductor spring tines with a cotton bud drenched with isopropyl alcohol. 8. Clean in the similar way the connector of the connected cable.
3. Commissioning 9. Remove metal chips and small particles from the mating and inner surfaces of the connector using compressed air. 10. Continue with the winding area using lint-free wipe drenched with isopropyl alcohol. 11. Continue with the inside mating surface of the inner ring. 12. Clean the outside surface of the center pin. MF0145ASA.
3. Commissioning 3.2.7. Antenna Cable Connector Assembly The figures in this chapter illustrate the cleaning procedure and do not show the actual RU. 1. What is needed for the connector assembly? a. Torque wrench. b. (Adjustable) counter wrench 2. Join the connectors and turn the coupling nut until the thread grips. 3. Push in the connector until it clicks. 4. Fasten the coupling nut hand-tight. Do not turn the connector but the coupling nut only. Page 28 MF0145ASA.
3. Commissioning 5. Retain the cable connector with the counter wrench and fasten the coupling nut with the torque wrench until the torque is applied (torque wrench clicks). Torque wrench For angled antenna connectors use your hand to retain the cable connector and fasten the coupling nut with the torque wrench. Make sure only the coupling nut is turned, not the cable connector. Counter wrench 3.2.8.
3. Commissioning With the mains power turned off, the power supply plug must be connected to the unit’s Mains connector. The Mains connector’s arrow tip and the power supply plug’s arrow tip must point to each other as shown in the figure below. Arrow tips must point to each other Power supply plug Mains connector at the RU (as shown in figure 3-12) figure 3-13 Power supply plug to RU Mains connector 3.2.8.2. DC Power Connection The DC Box and the RU are already connected.
3. Commissioning Then, connect your local supply cable by feeding it through a cable gland that should at least provide IP55: Torque: 6.5 N-m Cable gland (IP55 required) Mains cable to RU (pre-installed) Local supply cable (minimum cross section: 6.6 mm² (≥ AWG 9) per potential / 9 mm² for cable) Then, close the cover again (torque: 1.45 N-m). 3.2.9.
3. Commissioning 3.2.10. Flowchart Commissioning an ION-M Extension Unit Manual for Extension Unit Philips screwdriver Mounting kit Spanner, size 13 mm Drilling machine Dowels Screw driver Screw driver Spanner, size 13 mm Start Preparation Unpack EU, EU accessories and mounting kit. Mechanical installation Fasten wall or pole mounting kit to wall or pole. Mechanical installation Mount EU to mounting kit, ensure suffient air flow and avoid thermal short circuits.
3. Commissioning No LED on? Check power switch inside EU (EUs with door). Check mains cabling. Check mains power. Yes Red LED status Internal Error Change power supply (EUs with a door). Reduce environmental temperature. Eliminate thermal short circuit. Disconnect and connect mains. Fans should run. If not, replace the fans at EU. MU: Change amplifier setting at MU controller Yellow Yellow LED status Yes Red Green Spare EU available? External error Green Close the door (EUs with a door).
4. Alarms and Troubleshooting 4. Alarms and Troubleshooting All alarms occurring can be checked via software at the Master Unit to where a message is transmitted when the software acknowledges a valid alarm. A new alarm message will not be repeated if the reason for the alarm is cleared or if the alarm continues. A new alarm message will be generated if the alarm is interrupted for at least five seconds after acknowledgement. Refer to the corresponding software documentation of the Master Unit for details.
5. Maintenance 5. Maintenance 5.1. General Read and observe chapter 1.2 Health and Safety. Caution: Rotating fans. Risk of injury in operation. Wear tight-fitting clothes and disconnect mains before connecting or replacing or cleaning the fan unit. Caution: The unit reaches high temperature in operation. Risk of burns by hot surface. Do not touch the unit before it has sufficiently cooled down. Due to the design of the Extension Unit the only component recommended to be replaced is the fan unit.
5. Maintenance 5.2. Replacing the Fan Unit Replacement of the fan unit is not required as a preventative measure. Only if an alarm indicates a malfunctioning of a fan, must the unit be exchanged. Note: Please observe that the fan unit can only be replaced as a whole. Do not remove the fans separately. Note: NEVER blow out the fan unit with compressed air. This would cause permanent damage to the unit. Read and observe chapter 1.2 Health and Safety as well as the instructions in section 5.
5. Maintenance 5.3. Cleaning the Heat Sink To avoid a malfunctioning of the Extension Unit, the heat sink should be cleaned in case of pollution. In order to prevent any damage, proceed as explained in the following. Note: Read and observe chapter 1.2 Health and Safety as well as the instructions in section 5.1 General before starting with the replacement procedure. Then, proceed as follows: 1. Switch off the Extension Unit.
6. Appendix 6. Appendix 6.1. Illustrations G3219M0 figure 6-1 Cabinet drawing (without DC Box) Page 38 MF0145ASA.
6. Appendix figure 6-2 Cabinet drawing (with DC Box) MF0145ASA.
6. Appendix 6.2. Specifications 6.2.1. Electrical Specifications Mains power, AC Power supply Mains power, DC Power consumption Connectors (main unit) Optical return loss Fiber type Optical link budget ION-M7HP/85HP EU Electrical nominal 100 Vac to 240 Vac operating 85 Vac to 264 Vac nominal 48 Vdc to 60 Vdc operating 36 Vdc to 72 Vdc max. temp., fully loaded 900 W room temp., idle 380 W Optical E2000/APC 8° 45 dB Single mode E9/125 mm 0 dB to 10 dB 6.2.2.
6. Appendix 6.3. Spare Parts The following list contains all parts available for the Extension Unit. The configuration of the delivered unit meets the requirements of the customer and can differ depending on the state of the delivery. Maintenance of the RU should be performed on an FRU (Field Replaceable Unit) basis only. Do not damage the warranty labels on the components, as this voids the warranty.
7. Index 7. Index A Alarms .................................................................... 34 List ..................................................................... 34 Installation Distance between Units .................................... 17 Electrical ........................................................... 22 Mechanical ........................................................ 15 M C CE Declaration of Conformity (DoC)...................... 10 Cleaning the Heat Sink ........................